Near-Accident During Simulated Flight Delayed 737 MAX Recertification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Thu, Nov 14, 2019

Near-Accident During Simulated Flight Delayed 737 MAX Recertification

Led To A Lengthy Redesign Of The Airplane's Computers

A near-accident during a simulated flight in June led to an extensive delay in the recertification of the 737 MAX, according to media reports.

Bloomberg reports that sources familiar with the incident indicated that the flight included a simulated computer glitch which caused an aggressive dive similar to those which led to two fatal accidents involving the airplane. That led to the extensive redesign of the computer systems which have delayed the airplane's reentry into service for months.

The sources said that the new problem goes beyond the initial issues that led to the accidents. While Boeing engineers had originally believed they could modify the MCAS, the problem that was discovered during the June simulation flight led to a complete redesign of the dual computer systems in the aircraft, which is considerably more complicated, according to The Hill. Former Boeing engineer Peter Lemme told Bloomberg that the number of scenarios that will need to be tested could be far more extensive.

The process has also been delayed by the FAA's requirements for documentation from Boeing. The agency is asking for additional documentation from the planemaker, which led to Boeing releasing a statement saying that it has been providing documentation "“in a format consistent with past submissions.”

“Regulators have requested that the information be conveyed in a different form, and the documentation is being revised accordingly,” the statement indicated.

“While this happens we continue to work with the FAA and global regulators on certification of the software for safe return of the MAX to service.”

Boeing has projected that the 737 MAX will return to service in January.

FMI: Source report
Source report

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC