F-35C Completes Developmental Test Phase 2 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Feb 08, 2016

F-35C Completes Developmental Test Phase 2

Included 66 Catapult Launches And Traps Aboard CVN-69

The F-35C Carrier Suitability Test Team deployed aboard the USS Dwight D. Eisenhower (CVN-69) for Developmental Test Phase Two (DT-II) in October 2015. Trials with F-35C test aircraft CF-3 and CF-5 spanned nine days in operating areas near the Atlantic coast between Florida and Virginia. DT-II followed a successful round of initial sea trials in 2014.

The team completed sixty-six catapults and traps to expand the gross weight and crosswind operating limits established on USS Nimitz (CVN-68) during DT-I. These tests included catapult launches up to the maximum aircraft gross weight with full internal stores as well as the expanding crosswind limits for launch and recovery. This testing supported the official US Navy aircraft launch and recovery bulletin that is required for fleet F-35C pilots to conduct carrier qualifications in 2016.

Additional testing completed on board the Ike included a variety of Logistics Test and Evaluation, or LT&E, tasks required to prove the F-35C can be maintained and supported above and below deck in the shipboard environment of a Nimitz class carrier. This testing included an engine run and Integrated Power Pack, or IPP, run in the hangar deck, deck spotting, chaining, weapons loading, as well as F135 engine compatibility testing in the ship’s engine shop.

Overall, the test team completed all required test objectives and finished ahead of schedule. . Only one sea trial deployment remains during F-35C development and those sea trials will complete all testing necessary for a full Block 3F fleet operation envelope with internal and external stores. DT-III is planned for the summer of 2016 when the test team again takes CF-03 and CF-05 back to sea for several weeks of testing. This final test phase will primarily focus on expanding the aircraft operating limits with a variety of symmetric and asymmetric external store configurations.

(Image provided with Lockheed Martin news release)

FMI: www.navy.mil, www.lockheedmartin.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC