Set In Stone ... Well ... Composites | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.07.24

Airborne-NextGen-10.08.24

Airborne-Unlimited-10.09.24

Airborne-FlightTraining-10.10.24

Airborne-Unlimited-10.11.24

Sat, Jul 03, 2010

Set In Stone ... Well ... Composites

Boeing Completes Firm Configuration Of 787-9 Dreamliner

Boeing announced Thursday that it has completed the firm configuration for the 787-9 Dreamliner. The announcement comes after years of collaboration with airline customers and partners to determine the optimal configuration for the new stretch version of the Dreamliner.

"Firm configuration means the airplane's structural, propulsion and systems architectures are defined and not changing," said Mark Jenks, vice president of 787-9 development, Boeing Commercial Airplanes. Boeing has completed the trade studies required to finalize the airplane's overall capability and basic design, allowing the airplane manufacturer and its suppliers to begin detailed design of parts, assemblies and other systems for the 787-9. As detailed designs are completed and released, production can begin. The first 787-9 delivery is scheduled for late 2013.

"We have a disciplined process in place to ensure we have completed all of the requirements for the development stage of the program," said Scott Fancher, vice president and general manager of the 787 program, Boeing Commercial Airplanes. "The team has done a fantastic job to get us through this important milestone."

The 787-9 is the second member of the 787 family. A slightly bigger version of the 787-8, the airplane will seat 250-290 passengers, 16 percent more than the 787-8. The 787-9 will have a range of 8,000 to 8,500 nautical miles. "We have been working closely with our customers for years to reach this milestone," said Mark Jenks, vice president of 787-9 development. "We are excited about the performance and capability this airplane will offer our customers."

Boeing says it remains on track for delivery of the first 787 to launch customer ANA in the fourth quarter of of this year.

FMI: www.boeing.com

Advertisement

More News

Aero-TV: Sonex Displays Two-Seat Aerobatic Prototype

Model Combines Lightweight Design with Pilot Comfort Sonex Aircraft showcased its first two-seat aerobatic prototype at this year’s EAA Oshkosh Airventure. Though it has not >[...]

Aero-News: Quote of the Day (10.07.24)

“Dynon is committed to enhancing flight safety and reducing pilot workload. We’re thrilled to expand the SkyView HDX Autopilot to Mooney M20J and M20K pilots. This adva>[...]

ANN's Daily Aero-Term (10.07.24): ARTS IIIA

ARTS IIIA The Radar Tracking and Beacon Tracking Level (RT&BTL) of the modular, programmable automated radar terminal system. ARTS IIIA detects, tracks, and predicts primary as>[...]

ANN's Daily Aero-Linx (10.07.24)

Aero Linx: General Aviation Safety Council (GASCo) GASCo was founded in 1964 to provide a forum in which all of the General Aviation organisations could meet to share safety inform>[...]

ANN's Daily Aero-Term (10.08.24): Blind Spot

Blind Spot An area from which radio transmissions and/or radar echoes cannot be received. The term is also used to describe portions of the airport not visible from the control tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC