Set In Stone ... Well ... Composites | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jul 03, 2010

Set In Stone ... Well ... Composites

Boeing Completes Firm Configuration Of 787-9 Dreamliner

Boeing announced Thursday that it has completed the firm configuration for the 787-9 Dreamliner. The announcement comes after years of collaboration with airline customers and partners to determine the optimal configuration for the new stretch version of the Dreamliner.

"Firm configuration means the airplane's structural, propulsion and systems architectures are defined and not changing," said Mark Jenks, vice president of 787-9 development, Boeing Commercial Airplanes. Boeing has completed the trade studies required to finalize the airplane's overall capability and basic design, allowing the airplane manufacturer and its suppliers to begin detailed design of parts, assemblies and other systems for the 787-9. As detailed designs are completed and released, production can begin. The first 787-9 delivery is scheduled for late 2013.

"We have a disciplined process in place to ensure we have completed all of the requirements for the development stage of the program," said Scott Fancher, vice president and general manager of the 787 program, Boeing Commercial Airplanes. "The team has done a fantastic job to get us through this important milestone."

The 787-9 is the second member of the 787 family. A slightly bigger version of the 787-8, the airplane will seat 250-290 passengers, 16 percent more than the 787-8. The 787-9 will have a range of 8,000 to 8,500 nautical miles. "We have been working closely with our customers for years to reach this milestone," said Mark Jenks, vice president of 787-9 development. "We are excited about the performance and capability this airplane will offer our customers."

Boeing says it remains on track for delivery of the first 787 to launch customer ANA in the fourth quarter of of this year.

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC