Sikorsky Assembling CH-53K Helicopter Ground Test Vehicle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jun 26, 2011

Sikorsky Assembling CH-53K Helicopter Ground Test Vehicle

First Of Five Prototypes Used To Develop Next Marine Corps Heavy-Lift Helicopter

Sikorsky has begun assembly of the CH-53K Helicopter Ground Test Vehicle (GTV) at Sikorsky’s Florida Assembly and Flight Operations (FAFO) facility in West Palm Beach, marking progress toward the system validation test phase of the Heavy Lift Replacement Program.

The GTV is the first of five prototype aircraft that will be built at the FAFO facility, under a $3 billion System Development and Demonstration (SDD) contract to develop a heavy lift helicopter replacement for the U.S. Marine Corps CH-53E helicopter. When the GTV prototype is assembled, it will be delivered to the Sikorsky Development Flight Center, located adjacent to the FAFO facility, to undergo ground-flight testing in early 2012. First flight is expected to occur during fiscal year 2014. The new aircraft program is planned to include production of more than 200 aircraft.

“When you see the components of the prototype aircraft being assembled, you begin to envision the power and capability that will be delivered with the CH-53K helicopter,” said CH-53K Helicopter Program Manager David Zack. “The main rotor hub and transmission on this new machine weigh 15,000 pounds – as much as a Black Hawk helicopter – and will carry nearly triple the payload of its predecessor, the CH-53E helicopter. It is an awesome sight to see this aircraft coming together after several years of designing, planning and coordination.”

“This program is well beyond design and planning, and the Ground Test Vehicle is in position four of the assembly line. We are looking forward to realizing the benefits of our technological advancements to the build process, along with physical integration of the subsystems throughout the build and ground test process,” Zack added.


CH-53K Artist's Rendering

Sikorsky opened the FAFO assembly center in March 2011, establishing a prototype assembly line for the new CH-53K Helicopter Operations Center. The state-of-the-art assembly facility provides wireless data connections to all operator plasma data screens and introduces the use of digital operation sheets to aid technicians through the four-position assembly line process. The facility is also outfitted with overhead power and air dropdowns, new aircraft work stands and overhead cranes to support aircraft final assembly and rotor head assembly operations.

A total of five SDD prototype aircraft will be built at the FAFO facility and participate in the ground/flight test program, with two additional airframe ground test articles to be assembled at Sikorsky’s main manufacturing plant in Stratford, CT. Once assembled, the ground test articles will undergo a series of structural tests ensuring safe operations of the Engineering Development Model (EDM) flight vehicles.

The CH-53K SDD program comprises major subcontracts valued at more than $1.1B.

FMI: www.sikorsky.com

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC