STS-107: Mission Summary | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-03.10.25

Airborne-NextGen-03.11.25

Airborne-Unlimited-03.12.25

Airborne-AffordableFlyers-03.13.25

Airborne-Unlimited-03.14.25

Tune in to www.airborne-live.net to watch our exclusive coverage of AEA 2025!
March 18 - Opening Session & New Product Introductions from 0830--1200 PDT
March 19 - First Day of LIVE interviews from the show floor: 1400--1630 PDT, 
March 20 - Day 2 of LIVE Interviews from the show floor: 1100--1400 PDT

Sat, Feb 01, 2003

STS-107: Mission Summary

STS-107 Flight: January 16-February 1, 2003

Crew:

Commander Rick D. Husband (second flight),
Pilot William C. McCool (first flight),
Payload Specialist Michael P. Anderson (second flight),
Mission Specialist Kalpana Chawla (second flight),
Mission Specialist David M. Brown (first flight),
Mission Specialist Laurel B. Clark (first flight),
Payload Specialist Ilan Ramon, Israel (first flight)

Payload:

First flight of SPACEHAB Research Double Module; Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR); first Extended Duration Orbiter (EDO) mission since STS-90. This 16-day mission is dedicated to research in physical, life, and space sciences, to be conducted in approximately 80 separate experiments, comprised of hundreds of samples and test points. The seven astronauts worked 24 hours a day, in two alternating shifts. 28 flights 1981-2003.

First flight:

April 12-14, 1981 (Crew John W. Young and Robert Crippen)

Most recent flight:

STS-109, March 1-12, 2002 Hubble Space Telescope Servicing Mission

Other notable missions:

STS 1 through 5, 1981-1982 first flight of European Space Agency built Spacelab. STS-50, June 25-July 9, 1992, first extended-duration Space Shuttle mission. STS-93, July 1999 placement in orbit of Chandra X-Ray Observatory.

Past mission anomaly:

STS-83, April 4-8, 1997. Mission was cut short by Shuttle managers due to a problem with fuel cell No. 2, which displayed evidence of internal voltage degradation after the launch.

FMI: www.nasa.gov

Advertisement

More News

Gogo Sponsors AEA-Live 2025 Coverage

See Gogo at AEA Booth 321! Installations of the Gogo Galileo Half-Duplex, HDX, electronically steered antenna are underway following PMA approval in early March. They are actively >[...]

Aero-News: Quote of the Day (03.17.25)

“I'm incredibly proud of our Team Members for their continued dedication to our Guests and each other throughout this process. Despite the challenges we've faced as an organi>[...]

ANN's Daily Aero-Term (03.17.25): Flight Management Systems

Flight Management Systems A computer system that uses a large data base to allow routes to be preprogrammed and fed into the system by means of a data loader. The system is constan>[...]

ANN's Daily Aero-Linx (03.17.25)

Aero Linx: Rhode Island Pilots Association (RIPA) Part of RIPA’s mission is to promote aviation safety within the entire aviation community, and we are dedicated to aviation >[...]

ANN's Daily Aero-Term (03.18.25): Advisory Service

Advisory Service Advice and information provided by a facility to assist pilots in the safe conduct of flight and aircraft movement.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC