L-3 Communications And Tenix Deliver Last Sea Sentinel Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Mar 16, 2005

L-3 Communications And Tenix Deliver Last Sea Sentinel Aircraft

Tenix Defence Aerospace and L-3 Communications Integrated Systems have delivered the last AP-3C aircraft in the production phase of the Sea Sentinel upgrade program, on time and within budget.

The Chief Executive Officer of Tenix Defence, Robert Salteri, said the delivery marked the completion of the largest and most complex aerospace modification and upgrade program in Australia to date.

"In 18 months, the Avalon-based team was able to modify and deliver the final 10 RAAF AP-3C aircraft to L-3 and the Commonwealth - on time and within budget," Mr. Salteri said.

"The success of this production phase illustrates what can be achieved when you team Australia's largest defence business with one of the world's leading Intelligence, Surveillance and Reconnaissance systems providers." The AP-3C aircraft is widely recognised, both domestically and within the international maritime patrol aircraft community, as the most capable aircraft of its type in operational service anywhere in the world.

The Sea Sentinel upgrade program involved modifying the P-3C aircraft to an AP-3C configuration, resulting in operational weight reduction and a significantly increased sensor capability.
The major new systems include:

  • Electronic flight instrument system
  • Navigation system
  • Forward and aft radar system
  • Sensor stations
  • Inter-communication system
  • Communication suite
  • Acoustics system
  • Data management system
  • Direction finding system

These were interfaced with all existing systems, and then tested, accepted and delivered.

FMI: www.tenix.com, www.l-3com.com

Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Bob Hoover At Airventure -- Flight Test and Military Service

From 2011 (YouTube Edition): Aviation's Greatest Living Legend Talks About His Life In Aviation (Part 5, Final) ANN is pleased to offer you yet another snippet from the public conv>[...]

Aero-News: Quote of the Day (11.12.25)

“All Air Traffic Controllers must get back to work, NOW!!! Anyone who doesn’t will be substantially ‘docked. For those Air Traffic Controllers who were GREAT PATR>[...]

ANN's Daily Aero-Linx (11.12.25)

Aero Linx: American Navion Society Welcome to the American Navion Society. Your society is here to support the Navion community. We are your source of technical and operating infor>[...]

ANN's Daily Aero-Term (11.12.25): Glideslope Intercept Altitude

Glideslope Intercept Altitude The published minimum altitude to intercept the glideslope in the intermediate segment of an instrument approach. Government charts use the lightning >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC