Spaceport America Runway Begins To Take Shape In NM | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Feb 22, 2010

Spaceport America Runway Begins To Take Shape In NM

Commercial Spaceport Will Have 10,000 Feet Of Concrete

The first batch of concrete was poured Thursday, February 11, marking the start of the final concrete finish phase of the runway construction at Spaceport America, the world's first purposebuilt commercial spaceport.  The runway project, which began in August 2009, is expected to be completed this summer, according to the New Mexico Spaceport Authority (NMSA).

The multi-layered runway is made up of 24 inches of prepared subgrade with the top six inches being a soil-cement mix foundation, followed by four inches of asphalt, and finally a 14-inch finish layer of concrete. Measuring 10,000 feet long by 200 feet wide, the runway is designed to support nearly every aircraft in the world, as well as the day-to-day space tourism and payload launch operations like those for Virgin Galactic's WhiteKnightTwo and SpaceShipTwo.

The large concrete runway will accommodate returning launch vehicles, fly-back rocket boosters and other space launch and training vehicles.


Photo Credit: Judd Bradley / Spaceport America

"The beginning of the concrete application to the runway marks a significant milestone in the realization of Spaceport America and commercial space in New Mexico," commented Steve Landeene, Spaceport America's Executive Director.  "The airfield lies strategically within the White Sands Missile Range restricted airspace call-up area, which provides a unique opportunity for customers to fly in either the national airspace system or full restricted zone, depending on the mission requirements."

Along with the runway project, work is proceeding on the 110,000-square foot Terminal Hangar Facility (THF) at Spaceport America.  The NMSA has been working closely with leading aerospace firms such as Virgin Galactic, Lockheed Martin, Moog-FTS, and UP Aerospace to develop commercial spaceflight at the new facility.

FMI: www.spaceportamerica.com

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC