ISS Update: Moving Day For Soyuz | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Mar 20, 2006

ISS Update: Moving Day For Soyuz

2006 Report #11, 1:30 p.m. CST, Friday, March 17, 2006

Expedition 12 Commander Bill McArthur and Flight Engineer Valery Tokarev plan to move their Soyuz capsule from the Earth-facing docking port of the station's Zarya module to an aft port on the Zvezda module on Monday, March 20.

If all goes as planned, the flight will take less than 40 minutes. Undocking is scheduled for 12:49 a.m. CST; with docking scheduled for 1:23 a.m. CST.

This move will clear the Zarya port for the March 31 arrival of the Expedition 13 crew and a Brazilian Space Agency astronaut on another Soyuz vehicle.

Preparations included testing Soyuz systems and thrusters and reviewing trip procedures. On Sunday, the crew will configure station and Soyuz systems. The configuration is to ensure the station could operate without the crew onboard; in the unlikely event the Soyuz could not successfully re-dock.

This week, Expedition 13 Commander Pavel Vinogradov and Flight Engineer Jeff Williams completed final training at the Gagarin Cosmonaut Training Center in Star City, Russia.

The crew will travel Saturday to the Baikonur Cosmodrome in Kazakhstan for final launch preparations, along with Brazilian astronaut Marcos Pontes. Pontes will fly to the station with Expedition 13 on a 10-day mission, returning to Earth with Expedition 12.

Launch is scheduled for March 29 at 8:30 p.m. CST.

NASA's payload operations team at the agency's Marshall Space Flight Center, Huntsville, Ala., worked with McArthur to test an experiment facility on the station. The thermal and pressure sensors inside the microgravity science glovebox are checked annually to keep it certified for experiments. McArthur completed inspection and cleaning of the facility.

McArthur also dedicated some of his free time last weekend to research work. On Saturday morning, he conducted an experiment that aims to improve future experiments that involve mixing fluids.

The cellular biotechnology operations support systems fluid dynamics investigation is a series of experiments to improve fluid mixing techniques and control bubble distribution for cell culture in orbit.

FMI: www.nasa.gov/station

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC