Comp Air CEO To Fly Latest Offering To AirVenture 2007 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Jul 19, 2007

Comp Air CEO To Fly Latest Offering To AirVenture 2007

Just A Bit Further Than Last Time

by ANN Correspondent Chris Esposito

Aiming for certification in the first quarter of 2010, Comp Air Inc. says its upcoming Comp Air 12 turboprop has generated considerable interest in the aviation community.

With the ability to climb to altitudes as high as 29,000 feet and cruise at 310 knots, the 12 packs an impressively powerful Honeywell turbine that allows for a 2800 foot-per-minute climb at gross weight. The Comp Air 12 is an all-composite aircraft and will have seating for 8-10. With an estimated fuel burn of 71 gallons an hour, maximum range will be an impressive 2,535 nautical miles.

The owner of Comp Air, Ron Lueck, is emphasizing the importance of safety throughout the certification process. "It's very personal. I'm the one building it, and I'm the one flying it," he says.

Honeywell representatives have been monitoring the engine, and working with Comp Air to assure that safety is paramount. The current prototype that will be flying to Oshkosh includes a liquid fire suppression system in the engine compartment, a heat detection system using FLIR technology, and SOAP testing every 50-100 hours to check on engine wear.

The Honeywell TPE331-14GR engine provides 1,650 horsepower, and requires an overhaul after an impressive 9000 hours. The Comp Air 12 will also include a fiber optic strain detector provided by Micron Optics. The same technology used on Boeing's 787 Dreamliner, the fiber optic health monitoring system will allow for the structural integrity of the airframe to be assessed continuously. This health monitoring system also includes vibration gauges and strain sensors placed throughout the wing and stabs. Literally hundreds of hours of data can be stored, so temperatures, pressures, and vibrations can be monitored throughout the testing process and any changes can be examined.

Certification for the Comp Air 12 is still a few years away... and the company is currently seeking funding to build the Comp Air 12 production model. Power will stay the same, though the fuselage will be 42" larger than the current version, and the horizontal stabilizer will be integrated into the fuselage instead of being on top of it. The size of the vertical stabilizer will also be increased... because as one can imagine, the 1,650 horsepower engine requires a lot of rudder.

Comp Air has been consulting with Downing Aviation Associates to assist in the certification and funding process, and the eventual goal is to produce 100 Comp Air 12's a year. Manufacturing of the aircraft is likely to occur off-site from Comp Air's current facility in Merritt Island, FL. While no deposits will be taken on the aircraft until NBAA, Comp Air has many letters of intent from prospective buyers. The new conforming aircraft will be started by the end of 2007, with possible changes including a Honeywell Apex avionics suite and a second door for the crew.

As with the plane's public unveiling at Lakeland earlier this year, the Comp Air 12 will be flown to AirVenture by Lueck himself. The 12 will be on display from July 23-29 at display #305/306, next to Aeroshell Square.

FMI: www.aerocompinc.com

Advertisement

More News

Classic Aero-TV: Extra Aircraft Announces the Extra 330SX

From 2023 (YouTube Edition): An Even Faster Rolling Extra! Jim Campbell joined General Manager of Extra Aircraft Duncan Koerbel at AirVenture 2023 to talk about what’s up and>[...]

Aero-News: Quote of the Day (11.15.25)

“Receiving our Permit to Fly and starting Phase 4 marks a defining moment for Vertical Aerospace. Our team has spent months verifying every core system under close regulatory>[...]

ANN's Daily Aero-Term (11.15.25): Middle Marker

Middle Marker A marker beacon that defines a point along the glideslope of an ILS normally located at or near the point of decision height (ILS Category I). It is keyed to transmit>[...]

NTSB Final Report: Lancair 320

The Experienced Pilot Chose To Operate In Instrument Meteorological Conditions Without An Instrument Flight Rules Clearance Analysis: The airplane was operated on a personal cross->[...]

Airborne 11.14.25: Last DC-8 Retires, Boeing Recovery, Teeny Trig TXP

Also: ATI Strike Prep, Spirit Still Troubled, New CubCrafters Dealership, A-29 Super Tucano Samaritan’s Purse is officially moving its historic Douglas DC-8 cargo jet into re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC