Record Year For The GE90 Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Jan 31, 2012

Record Year For The GE90 Engine

GE Receives Commitments For 400 Units

The GE90 engine experienced its most successful year in 2011, accumulating airline and freighter operator commitments for 400 engines with a list price of more than $11 billion. This surpasses the previous record of 250 engine commitments in 2007.

This year included a record-setting Emirates' order for 50 Boeing 777s, powered by GE90-115B engines, announced at the Dubai Air Show in November.
 
"The Boeing 777 and GE90 engine combination is growing in popularity with customers worldwide and is the best-selling aircraft-engine combination in its class,"said Bill Millhaem, general manager of the GE90 Program at GE Aviation. "Total orders for the GE90 engine family now exceed 2,000 engines with a backlog of 800 engines that will be delivered in the next four years."

The 200 aircraft commitments announced in 2001 are for GE90-powered Boeing 777-300ERs and Freighters.

The production rate for the GE90 is growing, with plans to produce more than 180 GE90 engines in 2012 up from 170 engines in 2011. The production rate is expected to climb to 225 engines in 2014.

Launched on the 777, the GE90 featured several technology "firsts"-- including carbon-fiber composite fan blades.
 
As the Boeing 777 aircraft grew in size thus requiring higher thrust engines, customer demand for the GE90 soared. The GE90-115B engine, developed for the 777-300ER and 777-200LR, entered service in 2002 -- the best service entry for any large GE engine at that time. The engine has can in-flight shutdown rate (IFSD) of just 0.001, which means only one engine IFSD per one million engine flight-hours.

The GE90 formed the basis for the GEnx for the new Boeing 787 and provided the core hot section for the Engine Alliance GP7200 engine for the A380. The GE90 architecture also influenced the new CFM International+ LEAP engine, the best-selling engine for the Boeing 737 MAX, Airbus A320neo, and COMAC C919 aircraft.

FMI: www.geaviation.com

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

NTSB Final Report: Capella Aircraft Corp FW1C50

Pilot Reported That He Was Unfamiliar With The Single Seat Amateur-Built Airplane And His Intent Was To Perform High-Speed Taxi Testing Analysis: The pilot reported that he was unf>[...]

Classic Aero-TV: Timber Tiger Touts Curtiss Jenny Replicas

From 2023 (YouTube Edition): First Kits to Ship October 2023 Having formerly resurrected the storied shape of the Ryan ST—in effigy, anyway—Montrose, Colorado-based Tim>[...]

ANN's Daily Aero-Term (07.04.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC