FAA Orders Inspections For Boeing 767 Pylons | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Jul 23, 2010

FAA Orders Inspections For Boeing 767 Pylons

Must Now Be Inspected After 8,000 Total Flights

The FAA is ordering U.S. operators of 138 Boeing 767 airplanes to reduce the initial pylon inspection time mandated in a September 22, 2005 AD from 10,000 to 8,000 total flights. This inspection must be done within 400 flights after the most recent inspection required by the 2005 directive, or within 90 days, whichever occurs later.

The FAA is also reducing the interval for repetitive inspections for cracking of the pylon midspar structural fittings and an adjacent structure from 1,500 to every 400 flights thereafter. There is also an option for replacing the fittings instead of conducting the inspections.

Since the 2005 Airworthiness Directive (AD), the FAA has received two reports of cracking of the midspar structural fitting on Boeing 767 pylons. The pylon attaches the engine to the wing. Undetected cracking could lead to fracture of the structural components, damage to the pylon, and separation of the engine from the wing.

The Immediately Adopted AD affects 138 U.S.-registered airplanes out of 314 worldwide. The total cost to U.S. operators is approximately $46,920. The AD affects only those 767 models that have the original pylon design. Boeing has improved the design of the 767 pylon and those aircraft with the improved pylon designs are not included in this AD.

FMI: www.ofr.gov/OFRUpload/OFRData/2010-17611_PI.pdf

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC