NASA Extends International Space Station Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Sep 15, 2010

NASA Extends International Space Station Contract

Boeing To Continue Engineering Support

NASA has awarded a five-year, $1.24 billion contract extension to The Boeing Co. to continue engineering support of the International Space Station through Sept. 30, 2015.

Work under the contract extension is intended to maintain the station at peak performance levels so the full value of the unique research laboratory is available to NASA, its international partners, other U.S. government agencies and private companies. NASA officially accepted the space station from Boeing at the conclusion of a March 2010 Acceptance Review Board that verified the delivery, assembly, integration and activation of all hardware and software required by the contract. The acceptance signified the transition from assembly of the station to utilization.

This action extends the space station’s Vehicle Sustaining Engineering Contract, which was originally awarded in January 1995 and most recently extended in 2008. The extension brings the total contract value through the end of fiscal year 2015 to $16.2 billion.

Work under the contract extension will include sustaining engineering of station hardware and software, and support of U.S. hardware and software provided to international partners and participants in the station program. The extension also includes end-to-end subsystem management for the majority of station systems, including materials and processes, electrical, electronic, and electromechanical parts, environments and electromagnetic effects.

NASA and its international partner agencies are in the final stages of analyzing the ability to sustain station operations through 2020 and awaiting formal confirmation of this goal by the governments of participating countries. This contract extension also includes assessment of the feasibility of extending the life of the primary structural hardware that was installed in orbit through the end of 2028.

The work will be performed at NASA's Johnson Space Center in Houston, Kennedy Space Center in Florida, Marshall Space Flight Center in Huntsville, Ala., and at other domestic and international locations.

FMI: www.nasa.gov/station

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC