Quito, Ecuador Schedules Runway Maintenance | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Mar 21, 2024

Quito, Ecuador Schedules Runway Maintenance

Maintenance Planned Well in Advance for Equatorial Aerodrome

Ecuador's Mariscal Sucre Quito International Airport has announced a few chunks of downtime for runway maintenance, describing some taxiway work and mainline repairs that will put the airport out of commission for windows in May, June, July, and September.

The maintenance work will cover more than 70,000 square meters of runway, helping to prevent emergency corrective work should existing wear and tear worsen in the future. Right now, they've scheduled a few windows: May 11th, May 18th; June 1st, July 6th, July 13th, July 20th, and September 7th,14th and 21st from 0200 hrs to 1200 hrs. A few more days have a different window, however, with June 8th, 15th, 22nd, and 29th seeing closures from 0200 hrs to 1400 hrs.

"The aerodrome closures have been coordinated and authorized by the General Directorate of Civil Aviation," Quiport Corporation, the airport's overseer, explained. "The airlines that operate at the Quito airport have already been informed of this need by Quiport and the DGAC through the respective NOTAM." The corp says that passengers planning a flight into Quito on the affected dates should already have their carriers touching base to clear up any issues already, but numbers and details can be found on their list of Quito attendees. 

"Quiport will also carry out maintenance work on taxiways A and B, which will not affect air operations, but which, together with the work on the runway, are necessary to keep the airport facilities in optimal condition."

FMI: www.aeropuertoquito.aero

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC