GEOStar-3 Mission Enabled By Aerojet Rocketdyne XR-5 Hall Thruster System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Aug 30, 2018

GEOStar-3 Mission Enabled By Aerojet Rocketdyne XR-5 Hall Thruster System

Al Yah 3 GEOStar-3 Spacecraft Achieves Orbit With Electric Propulsion

Aerojet Rocketdyne and Northrop Grumman together recently achieved a significant milestone with the successful completion of electric propulsion orbit acquisition operations on the Al Yah 3 GEOStar-3 spacecraft. Aerojet Rocketdyne’s XR-5 Hall Thruster system operated for more than 600 hours (over 25 days of firing) to propel the spacecraft to the intended orbit, which aided recovery from a launch insertion anomaly.

“Mission success is always our priority at Aerojet Rocketdyne,” said Aerojet Rocketdyne CEO and President Eileen Drake. “Working with our customer Northrop Grumman to ensure their spacecraft reached its intended orbit with our XR-5 Hall Thruster system speaks to our core value of teamwork.”

This mission is the first Northrop Grumman GEOStar-3 spacecraft to fly the Aerojet Rocketdyne XR-5 Hall Thruster system, and the first time the system has been utilized in a commercial mission. Electric propulsion orbit acquisition operations of the XR-5 subsystem and all checkout operations of the spacecraft were recently concluded, and the spacecraft is now operational.

Each Aerojet Rocketdyne XR-5 subsystem aboard a GEOStar-3 spacecraft consists of four XR-5 Hall Thrusters and two power processing units to drive the thrusters. GEOStar-3 satellites are used to provide a variety of communications services, including direct-to-home TV broadcasting, broadband connectivity, cable program distribution, business data network capacity, regional mobile communications and similar services.

“The first commercial operation for the XR-5 is a significant milestone for Aerojet Rocketdyne,” added Drake. “Electric propulsion technology can greatly increase the revenue-generating potential of commercial satellites by replacing propellant mass with communication transponders.”

The Al Yah 3 mission is the fifth flight mission to utilize Aerojet Rocketdyne’s XR-5 Hall system. All four previous missions were commissioned by the U.S. Government. Multiple XR-5 commercial missions are already scheduled for 2018.

(Image provided with Aerojet Rocketdyne news release)

FMI: www.Rocket.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC