Boeing Introduces New Method For Building 777 Fuselages | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Mon, Jul 21, 2014

Boeing Introduces New Method For Building 777 Fuselages

Fuselage Automated Upright Build Expected To Yield Safety, Quality Benefits

Boeing is in the final phases of testing and production readiness of a new method for building 777 fuselages as part of its ongoing technology investment strategy, the company says.

Known as the Fuselage Automated Upright Build, or FAUB, this Advanced Manufacturing technology improves workplace safety and increases product quality. This technology has been in development by Boeing since 2012.

With this new technology, fuselage sections will be built using automated, guided robots that will fasten the panels of the fuselage together, drilling and filling the more than approximately 60,000 fasteners that are today installed by hand.

FAUB offers numerous benefits including an improvement in employee safety. The nature of the drilling and filling work makes it ideal for an automated solution. More than half of all injuries on the 777 program have occurred during the phase of production that is being automated. In addition, the automated system is expected to reduce build times and improve first-time quality of the build process.

"This is the first time such technology will be used by Boeing to manufacture widebody commercial airplanes and the 777 program is leading the way," said Elizabeth Lund, vice president and general manager, 777 program and Everett site, Boeing Commercial Airplanes. "We're excited to continue improving the production process here and we're positioning ourselves to begin building 777X airplanes in the future."

The 777 program has already begun testing FAUB at a facility in Anacortes, WA Production readiness preparations are underway and the system will be installed in Everett in a new portion of the main factory that is under construction now. The technology is expected to be implemented in the next few years.

The robotic system, designed for Boeing by KUKA Systems, is the latest in a series of strategic Advanced Manufacturing moves on the 777 program, which have already included new systems for painting wings and other drilling operations.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC