COVID Exposure Issue Shuts Down Van's Aircraft Shipping Through 1/15 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Wed, Jan 06, 2021

COVID Exposure Issue Shuts Down Van's Aircraft Shipping Through 1/15

Temporary Shipping Closure Results After Shipping Team Sent Home

The COVID effect continues... this time to the folks at Van's Aircraft. Van's tells us that, "Due to a recent, unfortunate COVID-19 exposure event, we have sent our parts and hardware shipping team home for a 14-day quarantine period. That means we have only a couple of people in place to try to support a workload that is normally staffed by more than 10 individuals."

"As a result, our shipping department is currently considered to be closed until January 15th, with the exception of bonified emergency shipments. If you have an aircraft stranded on the ground or another similarly legitimate emergency need, we will do the very best we can to help you out. Note that this closure primarily affects shipments of RV parts, accessories, and hardware. We will continue to ship RV kits (larger crated items), which are packed and managed by a different team. If we discover cases where certain kit-related items cannot be included we will backorder those individual items, if and when necessary, and ship them to you when available."

During this time, the shipping team will not be available to answer phones -- so, if you have an urgent need, please email shipping@vansaircraft.com and be sure to include your order number and other specifics.

Van's will keep taking web and phone orders during this time, but non-priority orders will not ship on a normal schedule. Further; they will not be able to accurately quote shipping timeframes for orders affected by this closure delay.

Van;s has asked for their customer's patience... "Please understand that this is a complicated time for us all, and especially difficult for the people who are working here to try to keep things running. We ask that you please be patient and considerate in dealing with our staff, as they’re all under a lot of pressure right now to keep things afloat and moving."

FMI: www.vansaircraft.com/

 


Advertisement

More News

Aero-News: Quote of the Day (10.16.25)

“This integration marks a significant step forward in cockpit connectivity and safety. It is one of few solutions offered to business aviation and rotorcraft operators that p>[...]

Airborne 10.15.25: Phantom 3500 Confounds, Citation CJ3 Gen2 TC, True Blue Power

Also: Kodiak 100 Joins USFS, Innovative Solutions & Support Renamed, Gulfstream Selects Honeywell, Special Olympics Airlift The Phantom 3500 mockup made an appearance where the>[...]

ANN's Daily Aero-Term (10.16.25): Enhanced Flight Vision System (EFVS)

Enhanced Flight Vision System (EFVS) An EFVS is an installed aircraft system which uses an electronic means to provide a display of the forward external scene topography (the natur>[...]

True Blue Power and Mid-Continent Instruments and Avionics Power NBAA25 Coverage

Mid-Continent Instruments and Avionics and True Blue Power ANN's NBAA 2025 Coverage... Visit Them At Booth #3436 True Blue Power Unveils 50 Amp-hour Lithium-ion, Main Ship Battery >[...]

NTSB Final Report: Bellanca 17-30A

Shortly After Takeoff, The Engine Completely Lost Power Analysis: The pilot reported that the engine start, run-up, and takeoff were without incident. However, shortly after takeof>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC