Setting Sail For ESA Spaceplane Recovery | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Oct 10, 2014

Setting Sail For ESA Spaceplane Recovery

Recovery Vessel Traveling From The Mediterranean To The Pacific Ocean

The Nos Aries received a special send-off at the 54th International boat show in Genoa as it began its long journey across the Mediterranean Sea and the Atlantic.

A team of mission engineers will board in Panama and from there sail through the Panama Canal and into the Pacific.

First, they will check the ship’s antenna and telemetry receivers are working properly after the long journey. The autotracking of the antenna that will pick up the signals from the Intermediate eXperimental Vehicle on its flight back to Earth will be checked by following low-orbit satellites.
 
Although the team have already practised the tricky manoeuvre of lifting IXV out of the ocean, they will continue to hone their skills under a wide range of conditions.
 
Nos Aries , the Mission Control Centre in Turin and ESA’s Spaceport in Kourou, French Guiana will be linked up via Inmarsat satellite for IXV mission simulations using voice, data and video. The crew will also take part in a dress rehearsal of the launch, three days before the actual liftoff.
 
The ship will reach its destination four days before the flight, slightly north of the equator, on a circle 25 km from the target landing spot. This distance guarantees the safety of the ship while allowing maximum telemetry reception and rapid access to IXV after splashdown.
 
On flight day, the ship will release weather balloons to check the wind conditions over the Pacific to provide information on IXV’s descent path. If sea conditions allow the launch to go ahead, Nos Aries will receive the readings from IXV’s 300 sensors during descent and then pick up the beacon signals to pinpoint the craft in the water.
 
Divers in speedboats will approach the floating craft and then stand back as sniffer devices check for residual propellant fumes. On the all-clear, the recovery cranes will carefully hoist IXV to safety before the fuel tank is cleaned out for the journey home to Europe.
 
Lofted by a Vega rocket, IXV will test the technologies and critical systems for Europe’s future automated reentry vehicles returning from low orbit.

(Image provided by the European Space Agency)

FMI: www.esa.int

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC