ISS 9 Crew Preparing For Next Tenants | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sun, Sep 26, 2004

ISS 9 Crew Preparing For Next Tenants

Padalka and Fincke have less than 30 days before return to earth

With less than a month remaining in their stay aboard the International Space Station, Expedition 9 Commander Gennady Padalka and NASA Science Officer Mike Fincke are preparing the orbiting complex for its next residents. The crew's work this week included taking inventory, performing maintenance on exercise equipment and continued troubleshooting of the onboard oxygen generator.

Roskosmos, the Russian Federal Space Agency, announced this week the next Station crew will launch at 11:17 p.m. CDT Oct. 10 aboard a Soyuz rocket from the Baikonur Cosmodrome, Kazakhstan. The Expedition 10 crew commander is Leroy Chiao and Salizhan Sharipov is flight engineer. Russian Space Forces Test Cosmonaut Yuri Shargin will accompany them for launch and spend about a week aboard the Station. Padalka, Fincke and Shargin will return to Earth Oct. 19.

This week, Padalka and Fincke performed routine maintenance work on the station's treadmill, a job done every six months. The treadmill provides cardiovascular training.

Additional troubleshooting work continued on the Elektron oxygen-generating unit. It produces breathing oxygen from wastewater. Sporadic operations of the unit led the Russian flight control team to believe contamination was preventing proper pressurization in a hydrogen line. Padalka cleaned the line. Further work is planned this weekend. As oxygen is generated from water by the unit, hydrogen is dumped overboard.

While the Elektron work continued, the Station's atmosphere was repressurized twice this week using oxygen from tanks on the Progress supply craft docked to the Station. If needed, many months' supply of oxygen is available for the crew even without the use of the Elektron. Oxygen is available on the Station in Progress tanks, Station tanks and oxygen-generating canisters.

The crew also continued to prepare for its trip home by taking food and hardware inventory. They also began stowing cargo containers and personal items for the return trip.

FMI: http://spaceflight.nasa.gov/gallery/images/station/crew-9/ndxpage1.html, http://spaceflight.nasa.gov, http://scipoc.msfc.nasa.gov

Advertisement

More News

Airborne 06.30.25: US v ADS-B Misuse, NatÂ’l STOL Fire, Volocopter Resumes

Also: Netherlands Donates 18 F16s, 2 737s Collide On Ramp, E-7 Wedgetail Cut, AgEagle's 100th In S Korea The Pilot and Aircraft Privacy Act was introduced in the House by Represent>[...]

Aero-News: Quote of the Day (07.06.25)

“This delivery represents more than just a milestone. It symbolizes our shared commitment to national security and our unwavering support for the men and women who serve on t>[...]

ANN's Daily Aero-Linx (07.06.25)

Aero Linx: Vintage Wings of Canada Foundation Vintage Wings of Canada is a not-for-profit, charitable organization with a collection of historically significant aircraft and is run>[...]

Classic Aero-TV: Portrait of the Army Aviation Heritage Foundation

From 2023 (YouTube Edition): To Preserve and Teach Incorporated as a non-profit domestic corporation in June 1997, the Army Aviation Heritage Foundation (AAHF) is a one-of-a-kind, >[...]

Airborne-NextGen 07.01.25: Volocopter Returns, B23 Energic, Iran Tech In UAVs?

Also: Air Taxis May Be Close, AgEagle Sells 100th, VAI Likes Bedford, AURA AERO Cleans Up Volocopter has resumed work towards the certification of its VoloCity eVTOL, this time und>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC