Aero-TV: Bombardier At NBAA 2011 -- Learjet 85 Progress Report | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Oct 12, 2011

Aero-TV: Bombardier At NBAA 2011 -- Learjet 85 Progress Report

Newest Lear On Track For 2013 EIS

Production of the new Learjet 85 aircraft has officially begun as the program successfully exited the Aircraft Level Critical Design Review. Development and production teams in Wichita, Kansas; Montréal, Québec; Belfast, Northern Ireland; and Querétaro, Mexico, are actively engaged in the manufacturing validation phase.

Ralph Acs, Vice President and General Manager, Learjet, Bombardier Business Aircraft said the airplane is making solid progress. He said the manufacturing sites are ready, production has begun, and they have been successfully building parts and we are ensuring that all quality standards are met for the Learjet 85 aircraft’s entry into service in 2013.

The Querétaro site is operational with production tooling in place. To date, several test fuselages and key elements of the composite structure have been produced at the facility to validate the manufacturing and assembly processes. In addition, a full-length composite fuselage has been assembled, and production of the first flight test vehicle is underway.

The Learjet 85 aircraft program supply base has started the fabrication of parts, and is on track with approximately 40 per cent of dedicated supplier test rigs that are operational, running their respective systems prior to shipment to the final line.

As part of Bombardier’s technology readiness program, over 12,000 test pieces have been produced to date. The first FAA structural certification test project was successfully completed this summer.

FMI: www.bombardier.com, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

 


Advertisement

More News

Aero-News: Quote of the Day (12.11.25)

"The owners envisioned something modern and distinctive, yet deeply meaningful. We collaborated closely to refine the flag design so it complemented the aircraft’s contours w>[...]

ANN's Daily Aero-Term (12.11.25): Nonradar Arrival

Nonradar Arrival An aircraft arriving at an airport without radar service or at an airport served by a radar facility and radar contact has not been established or has been termina>[...]

Classic Aero-TV: David Uhl and the Lofty Art of Aircraft Portraiture

From 2022 (YouTube Edition): Still Life with Verve David Uhl was born into a family of engineers and artists—a backdrop conducive to his gleaning a keen appreciation for the >[...]

Airborne-NextGen 12.09.25: Amazon Crash, China Rocket Accident, UAV Black Hawk

Also: Electra Goes Military, Miami Air Taxi, Hypersonics Lab, MagniX HeliStrom Amazon’s Prime Air drones are back in the spotlight after one of its newest MK30 delivery drone>[...]

Airborne 12.05.25: Thunderbird Ejects, Lost Air india 737, Dynon Update

Also: Trailblazing Aviator Betty Stewart, Wind Farm Scrutiny, Chatham Ban Overturned, Airbus Shares Dive A Thunderbird pilot, ID'ed alternately as Thunderbird 5 or Thunderbird 6, (>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC