Aero-TV: Bombardier At NBAA 2011 -- Learjet 85 Progress Report | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Oct 12, 2011

Aero-TV: Bombardier At NBAA 2011 -- Learjet 85 Progress Report

Newest Lear On Track For 2013 EIS

Production of the new Learjet 85 aircraft has officially begun as the program successfully exited the Aircraft Level Critical Design Review. Development and production teams in Wichita, Kansas; Montréal, Québec; Belfast, Northern Ireland; and Querétaro, Mexico, are actively engaged in the manufacturing validation phase.

Ralph Acs, Vice President and General Manager, Learjet, Bombardier Business Aircraft said the airplane is making solid progress. He said the manufacturing sites are ready, production has begun, and they have been successfully building parts and we are ensuring that all quality standards are met for the Learjet 85 aircraft’s entry into service in 2013.

The Querétaro site is operational with production tooling in place. To date, several test fuselages and key elements of the composite structure have been produced at the facility to validate the manufacturing and assembly processes. In addition, a full-length composite fuselage has been assembled, and production of the first flight test vehicle is underway.

The Learjet 85 aircraft program supply base has started the fabrication of parts, and is on track with approximately 40 per cent of dedicated supplier test rigs that are operational, running their respective systems prior to shipment to the final line.

As part of Bombardier’s technology readiness program, over 12,000 test pieces have been produced to date. The first FAA structural certification test project was successfully completed this summer.

FMI: www.bombardier.com, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

 


Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC