Lockheed Martin Receives 3rd Lot F-35 Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Thu, Jun 04, 2009

Lockheed Martin Receives 3rd Lot F-35 Contract

17 More Stealth Fighters Slated for Production

The United States Department of Defense has awarded Lockheed Martin a $2.1 billion contract modification to produce 17 F-35 Lightning II stealth fighters in the third lot of low-rate initial production (LRIP). The buy also includes the first international orders - two F-35 operational test aircraft for the United Kingdom and one for the Netherlands.

The contract adds to a May 2008 award of $197 million to fund LRIP 3 long-lead materials, and to a March 2009 contract modification award of $320 million for tooling and test equipment, also beginning in LRIP 3.

Assembly of 14 aircraft in the first two LRIP lots is already under way, with initial F-35 deliveries to the U.S. Air Force scheduled to begin in 2010. Eight development aircraft have entered testing, and the remaining 11 are planned to roll out by year's end.

"As we move more deeply into F-35 production, we are seeing the steady increases in quality and efficiency that track to our target production rate of one aircraft per working day in the 2015 time frame," said Dan Crowley, Lockheed Martin executive vice president and F-35 program general manager.

The F-35 is a supersonic, multi-role, 5th generation stealth fighter. Three F-35 variants derived from a common design, developed together and using the same sustainment infrastructure worldwide, will replace at least 13 types of aircraft for nine nations initially, reportedly making the Lightning II 'the most cost-effective fighter program in history.'

FMI: http://www.jsf.mil/

Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

ANN's Daily Aero-Linx (05.29.24)

Aero Linx: International Association of Professional Gyroplane Training (IAPGT) We are an Association of people who fly, build or regulate Gyroplanes, who have a dream of a single >[...]

ANN's Daily Aero-Term (05.29.24): NORDO (No Radio)

NORDO (No Radio) Aircraft that cannot or do not communicate by radio when radio communication is required are referred to as “NORDO.”>[...]

Airborne 05.28.24: Jump Plane Down, Starship's 4th, Vision Jet Problems

Also: uAvionix AV-Link, F-16 Viper Demo, TN National Guard, 'Staff the Towers' A Saturday afternoon jump run, originating from SkyDive Kansas City, went bad when it was reported th>[...]

ANN's Daily Aero-Term (05.30.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC