AD: ATR-GIE Avions de Transport Régional Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, May 30, 2021

AD: ATR-GIE Avions de Transport Régional Airplanes

AD 2021-09-18 Requires Modifying The Electrical Harness Routes And De-Icing Pipe Coupling Installations

The FAA is adopting a new airworthiness directive (AD) for certain ATR-GIE Avions de Transport Régional Model ATR72-212A airplanes.

This AD was prompted by a report of an engine electrical control #1 fault during flight caused by chafing damage on an electrical harness bundle. This AD requires modifying the electrical harness routes and de-icing pipe coupling installations, as specified in a European Union Aviation Safety Agency (EASA) AD, which is incorporated by reference. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective July 1, 2021.

Supplementary Information: The EASA, which is the Technical Agent for the Member States of the European Union, has issued EASA AD 2020-0227, dated October 19, 2020 (EASA AD 2020-0227) (also referred to as the Mandatory Continuing Airworthiness Information, or the MCAI), to correct an unsafe condition for certain ATR-GIE Avions de Transport Régional Model ATR72-212A airplanes.

The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to certain ATR-GIE Avions de Transport Régional Model ATR72-212A airplanes. The NPRM published in the Federal Register on February 22, 2021 (86 FR 10491). The NPRM was prompted by a report of an engine electrical control #1 fault during flight caused by chafing damage on an electrical harness bundle. The NPRM proposed to require modifying the electrical harness routes and de-icing pipe coupling installations, as specified in EASA AD 2020-0227.

The FAA is issuing this AD to address chafing damage on an electrical harness bundle, which could result in wire failure and a short circuit, an uncontrolled fire, and consequent loss of multiple systems, possibly resulting in reduced controllability of the airplane. See the MCAI for additional background information.

FMI: www.regulations.gov

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC