AD: ATR-GIE Avions de Transport Régional Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Sun, May 30, 2021

AD: ATR-GIE Avions de Transport Régional Airplanes

AD 2021-09-18 Requires Modifying The Electrical Harness Routes And De-Icing Pipe Coupling Installations

The FAA is adopting a new airworthiness directive (AD) for certain ATR-GIE Avions de Transport Régional Model ATR72-212A airplanes.

This AD was prompted by a report of an engine electrical control #1 fault during flight caused by chafing damage on an electrical harness bundle. This AD requires modifying the electrical harness routes and de-icing pipe coupling installations, as specified in a European Union Aviation Safety Agency (EASA) AD, which is incorporated by reference. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective July 1, 2021.

Supplementary Information: The EASA, which is the Technical Agent for the Member States of the European Union, has issued EASA AD 2020-0227, dated October 19, 2020 (EASA AD 2020-0227) (also referred to as the Mandatory Continuing Airworthiness Information, or the MCAI), to correct an unsafe condition for certain ATR-GIE Avions de Transport Régional Model ATR72-212A airplanes.

The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to certain ATR-GIE Avions de Transport Régional Model ATR72-212A airplanes. The NPRM published in the Federal Register on February 22, 2021 (86 FR 10491). The NPRM was prompted by a report of an engine electrical control #1 fault during flight caused by chafing damage on an electrical harness bundle. The NPRM proposed to require modifying the electrical harness routes and de-icing pipe coupling installations, as specified in EASA AD 2020-0227.

The FAA is issuing this AD to address chafing damage on an electrical harness bundle, which could result in wire failure and a short circuit, an uncontrolled fire, and consequent loss of multiple systems, possibly resulting in reduced controllability of the airplane. See the MCAI for additional background information.

FMI: www.regulations.gov

Advertisement

More News

Classic Aero-TV: UAvionix - Transitioning Between Manned & Unmanned Technologies

From 2017 (YouTube Edition): ADS-B For Airplanes And Drones… ADS-B technology developed by uAvionix has come full circle. The company began with a device developed for manne>[...]

ANN's Daily Aero-Term (09.14.25): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

Aero-News: Quote of the Day (09.14.25)

"The next great technological revolution in aviation is here. The United States will lead the way, and doing so will cement America’s status as a global leader in transportat>[...]

ANN's Daily Aero-Linx (09.14.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

Airborne-NextGen 09.09.25: Textron Nixes ePlane, Joby L/D Flt, Swift Approval

Also: Space Command Moves, Alpine Eagle, Duffy Names Amit Kshatriya, Sikorsky-CAL FIRE Collab Textron eAviation is putting the development of its Nexus electric vertical takeoff an>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC