NASA Readies Orbiters For Upcoming Flights To ISS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.17.24

Airborne-NextGen-06.18.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Sat, Jun 02, 2007

NASA Readies Orbiters For Upcoming Flights To ISS

Atlantis Ready For Launch; Endeavour, Discovery In The Wings

Officials with NASA updated ANN this week on the status of the equipment slated to fly the next three shuttle missions to the International Space Station... Ed.

Mission: STS-117 - 21st International Space Station Flight (13A)
S3/S4 Truss Segment Solar Arrays
Vehicle: Atlantis (OV-104)
Location: Launch Pad 39A
Launch Date: June 8, 2007
Crew: Sturckow, Archambault, Reilly, Swanson, Forrester, Olivas and Anderson Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

At the Launch Readiness Review meeting this week, Space Shuttle Program managers officially set the STS-117 launch date for June 8. At Launch Pad 39A, operations are proceeding on schedule to meet that date. This week, the orbiter, ground and solid rocket booster pyro initiator circuit resistance tests were completed. The orbiter midbody umbilical unit mate operations were also performed. Aft closeout operations are under way, with completion scheduled for this weekend. Stowage of flight crew equipment is in progress, and ordnance installation is complete. This weekend, the orbiter's main engines, orbital maneuvering system and forward reaction control system will be pressurized for flight.

Mission: STS-118 - 22nd International Space Station Flight (13A.1)
S5 Truss Segment
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2 Launch Date: Targeted for Aug. 9, 2007 Launch Pad: 39A
Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 2, Endeavour's aero surfaces, such as the elevons, body flaps and rudder speed brake, are configured for modal testing, which checks the structural integrity of the vehicle. Nose landing gear door rigging is nearing completion. Closeout of the orbiter's aft and forward sections is under way. Work is also nearing completion on structural leak checks of the orbital maneuvering system pods, forward compartment and forward reaction control system.

In high bay No. 1 of the Vehicle Assembly Building, stacking of the solid rocket boosters continues for STS-118.

Mission: STS-120 - 23rd International Space Station Flight (10A) -
U.S. Node 2
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Targeted for Oct. 20, 2007
Launch Pad: 39A
Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Testing of the "shuttle to station power transfer system" is complete. Functional testing of the atmospheric revitalization pressure control system, part of the orbiter's life support system, continued this week. Modifications to Discovery's engine cutoff sensor wiring continue, as does the installation of BRI tile around the main landing gear doors and external tank doors.

FMI: www.nasa.gov/shuttle

Advertisement

More News

USCG MH-60 To The Rescue (Again) -- Rescues 4 Boaters

Capsized Vessel Located Near Dauphin Island, Alabama The Coast Guard rescued four boaters after their vessel capsized near Dauphin Island, Alabama, Thursday. Coast Guard District E>[...]

Gray Eagle Order Placed for Army National Guard

Reserve Components Looking to Improve In-House General Atomics Aeronautical Systems announced a fresh order for a dozen Gray Eagle 25M UAVs with accompanying equipment, for fulfill>[...]

Aero-Biz Survival 101 (1120a): Expert Ideas To Help You Through Tough Times

Brand New! Avoid The Need For A Comeback... Get Your Marketing Right, Right Now! Some time ago, the Aero-News Network, responding to numerous requests, established a marketing and >[...]

Airborne 06.03.24: Rotax 915/916 SB, Starship 4 Ready?, B-17 Mementos

Also: Hubble On Pause, FedEx Pilots Picket, Nexus eVTOL, VFS Honors The Rotax folks have published a Service Bulletin after issues were noted that may affect all R915i and R916i se>[...]

Mid-Continent Instruments and Avionics Mourns Former Leader

John W. Winter of AEA and Avionic Fame Passes John W. Winter brought Mid-Continent Instrument Company into the modern era in 1980, purchasing the firm and using it as a base for ex>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC