NASA Readies Orbiters For Upcoming Flights To ISS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Jun 02, 2007

NASA Readies Orbiters For Upcoming Flights To ISS

Atlantis Ready For Launch; Endeavour, Discovery In The Wings

Officials with NASA updated ANN this week on the status of the equipment slated to fly the next three shuttle missions to the International Space Station... Ed.

Mission: STS-117 - 21st International Space Station Flight (13A)
S3/S4 Truss Segment Solar Arrays
Vehicle: Atlantis (OV-104)
Location: Launch Pad 39A
Launch Date: June 8, 2007
Crew: Sturckow, Archambault, Reilly, Swanson, Forrester, Olivas and Anderson Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

At the Launch Readiness Review meeting this week, Space Shuttle Program managers officially set the STS-117 launch date for June 8. At Launch Pad 39A, operations are proceeding on schedule to meet that date. This week, the orbiter, ground and solid rocket booster pyro initiator circuit resistance tests were completed. The orbiter midbody umbilical unit mate operations were also performed. Aft closeout operations are under way, with completion scheduled for this weekend. Stowage of flight crew equipment is in progress, and ordnance installation is complete. This weekend, the orbiter's main engines, orbital maneuvering system and forward reaction control system will be pressurized for flight.

Mission: STS-118 - 22nd International Space Station Flight (13A.1)
S5 Truss Segment
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2 Launch Date: Targeted for Aug. 9, 2007 Launch Pad: 39A
Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 2, Endeavour's aero surfaces, such as the elevons, body flaps and rudder speed brake, are configured for modal testing, which checks the structural integrity of the vehicle. Nose landing gear door rigging is nearing completion. Closeout of the orbiter's aft and forward sections is under way. Work is also nearing completion on structural leak checks of the orbital maneuvering system pods, forward compartment and forward reaction control system.

In high bay No. 1 of the Vehicle Assembly Building, stacking of the solid rocket boosters continues for STS-118.

Mission: STS-120 - 23rd International Space Station Flight (10A) -
U.S. Node 2
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Targeted for Oct. 20, 2007
Launch Pad: 39A
Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Testing of the "shuttle to station power transfer system" is complete. Functional testing of the atmospheric revitalization pressure control system, part of the orbiter's life support system, continued this week. Modifications to Discovery's engine cutoff sensor wiring continue, as does the installation of BRI tile around the main landing gear doors and external tank doors.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC