ISS Gyroscope Up And Running | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.07.24

Airborne-NextGen-10.08.24

Airborne-Unlimited-10.09.24

Airborne-FlightTraining-10.10.24

Airborne-Unlimited-10.11.24

Mon, Jul 05, 2004

ISS Gyroscope Up And Running

Tests Show Spacewalk Paid Off

A newly reactivated gyroscope on the International Space Station today was successfully brought on line for attitude control at 6:20 a.m. CDT. The Control Moment Gyroscope 2 was fully operational at 6,600 revolutions per minute Thursday afternoon after being powered back on as a result of this week’s spacewalk. Testing overnight proved its operation adequate for orientation control.

Expedition 9 Commander Gennady Padalka and Flight Engineer and NASA ISS Science Officer Mike Fincke replaced a failed circuit breaker providing power to the gyroscope during a 5-hour, 40-minute spacewalk Wednesday. The gyroscope now joins two others in controlling the Station’s orientation during normal operations.

Today the crew completed clean-up tasks for the spacewalk, including hanging the Russian Orlan-M spacesuits out to dry, stowing tools and conducting a follow-up conference with spacewalk specialists. Tomorrow the sleep shift schedule for the crewmembers will be back to normal as they begin a three-day weekend to commemorate the US Independence Day holiday Monday. The crew will finish up spacewalk close out tasks next week and is scheduled to work on science experiments, such as the Advanced Diagnostic Ultrasound in Microgravity.

FMI: http://spaceflight.nasa.gov

Advertisement

More News

Aero-TV: Sonex Displays Two-Seat Aerobatic Prototype

Model Combines Lightweight Design with Pilot Comfort Sonex Aircraft showcased its first two-seat aerobatic prototype at this year’s EAA Oshkosh Airventure. Though it has not >[...]

Aero-News: Quote of the Day (10.07.24)

“Dynon is committed to enhancing flight safety and reducing pilot workload. We’re thrilled to expand the SkyView HDX Autopilot to Mooney M20J and M20K pilots. This adva>[...]

ANN's Daily Aero-Term (10.07.24): ARTS IIIA

ARTS IIIA The Radar Tracking and Beacon Tracking Level (RT&BTL) of the modular, programmable automated radar terminal system. ARTS IIIA detects, tracks, and predicts primary as>[...]

ANN's Daily Aero-Linx (10.07.24)

Aero Linx: General Aviation Safety Council (GASCo) GASCo was founded in 1964 to provide a forum in which all of the General Aviation organisations could meet to share safety inform>[...]

ANN's Daily Aero-Term (10.08.24): Blind Spot

Blind Spot An area from which radio transmissions and/or radar echoes cannot be received. The term is also used to describe portions of the airport not visible from the control tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC