Near-Accident During Simulated Flight Delayed 737 MAX Recertification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Nov 14, 2019

Near-Accident During Simulated Flight Delayed 737 MAX Recertification

Led To A Lengthy Redesign Of The Airplane's Computers

A near-accident during a simulated flight in June led to an extensive delay in the recertification of the 737 MAX, according to media reports.

Bloomberg reports that sources familiar with the incident indicated that the flight included a simulated computer glitch which caused an aggressive dive similar to those which led to two fatal accidents involving the airplane. That led to the extensive redesign of the computer systems which have delayed the airplane's reentry into service for months.

The sources said that the new problem goes beyond the initial issues that led to the accidents. While Boeing engineers had originally believed they could modify the MCAS, the problem that was discovered during the June simulation flight led to a complete redesign of the dual computer systems in the aircraft, which is considerably more complicated, according to The Hill. Former Boeing engineer Peter Lemme told Bloomberg that the number of scenarios that will need to be tested could be far more extensive.

The process has also been delayed by the FAA's requirements for documentation from Boeing. The agency is asking for additional documentation from the planemaker, which led to Boeing releasing a statement saying that it has been providing documentation "“in a format consistent with past submissions.”

“Regulators have requested that the information be conveyed in a different form, and the documentation is being revised accordingly,” the statement indicated.

“While this happens we continue to work with the FAA and global regulators on certification of the software for safe return of the MAX to service.”

Boeing has projected that the 737 MAX will return to service in January.

FMI: Source report
Source report

Advertisement

More News

Airborne 06.30.25: US v ADS-B Misuse, NatÂ’l STOL Fire, Volocopter Resumes

Also: Netherlands Donates 18 F16s, 2 737s Collide On Ramp, E-7 Wedgetail Cut, AgEagle's 100th In S Korea The Pilot and Aircraft Privacy Act was introduced in the House by Represent>[...]

Aero-News: Quote of the Day (07.06.25)

“This delivery represents more than just a milestone. It symbolizes our shared commitment to national security and our unwavering support for the men and women who serve on t>[...]

ANN's Daily Aero-Linx (07.06.25)

Aero Linx: Vintage Wings of Canada Foundation Vintage Wings of Canada is a not-for-profit, charitable organization with a collection of historically significant aircraft and is run>[...]

Classic Aero-TV: Portrait of the Army Aviation Heritage Foundation

From 2023 (YouTube Edition): To Preserve and Teach Incorporated as a non-profit domestic corporation in June 1997, the Army Aviation Heritage Foundation (AAHF) is a one-of-a-kind, >[...]

Airborne-NextGen 07.01.25: Volocopter Returns, B23 Energic, Iran Tech In UAVs?

Also: Air Taxis May Be Close, AgEagle Sells 100th, VAI Likes Bedford, AURA AERO Cleans Up Volocopter has resumed work towards the certification of its VoloCity eVTOL, this time und>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC