NTSB Prelim: Diamond Aircraft Ind Inc DA 40 NG | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Fri, Dec 29, 2023

NTSB Prelim: Diamond Aircraft Ind Inc DA 40 NG

Loss Of Power Was Accompanied By A Loss Of Oil Pressure And Dual Engine Control Unit (ECU) Failure

Location: Asheville, NC Accident Number: ERA24LA066
Date & Time: December 14, 2023, 20:15 Local Registration: N907L
Aircraft: Diamond Aircraft Ind Inc DA 40 NG Injuries: 1 Serious, 1 Minor
Flight Conducted Under: Part 91: General aviation - Instructional

On December 14, 2023, at 2015 eastern standard time, a Diamond Aircraft Ind. Inc. DA-40 NG airplane, N907L, was substantially damaged when it was involved in an accident near Asheville, North Carolina. The flight instructor sustained minor injuries and the private pilot was seriously injured. The airplane was operated as a Title 14 Code of Federal Regulations Part 91 instructional flight.

The flight instructor and private pilot were conducting a cross-country flight at night when they felt a “shudder” followed by a loss of engine power. The loss of power was accompanied by a loss of oil pressure and dual engine control unit (ECU) failure. The flight instructor took control of the airplane and used the checklist to restart the (diesel) engine. The engine restarted momentarily but again lost power shortly after. The flight instructor was able to restart the engine again, but the cockpit began to fill with smoke before the engine lost power a final time. The flight instructor then made a forced landing to an interstate. Just prior to landing, the airplane struck an energized power line, and the airplane impacted the ground and caugh fire.

The airplane wreckage was recovered to a secure facility for further examination. At the time the airplane was recovered, a connecting rod was observed separated from the engine. The airplane received its airworthiness certificate on September 25, 2023, and it’s last 100-hr maintenance inspection was completed on December 9, 2023. At that time, the airplane and engine had accrued a total of 95 flight hours.

FMI: www.ntsb.gov

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC