Partial Government Shutdown Halts NTSB Investigations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Thu, Jan 17, 2019

Partial Government Shutdown Halts NTSB Investigations

FAA Recalling Some Aviation Safety Inspectors

The partial government shutdown has forced the furlough of most NTSB investigators, forcing the board to halt its accident investigation work.

Politico reports that there are 12 incidents so far that are not being looked into, including a GA accident that fatally injured four people. In at least four incidents, the furloughs have prevented the NTSB from gathering the necessary information to make a determination about opening an investigation.

The NTSB’s acting director of the Office of Safety Recommendations and Communications Dolline Hatchett said that all of the incidents will be investigated once the partial shutdown ends. Some investigators have been reinstated to assist in aviation accidents in Indonesia, Mexico and South Korea, she said.

In addition, eleven meetings or presentations have been cancelled or postponed, including the release of the NTSB's "Most Wanted List" of safety recommendations that was set for release January 15.

Meanwhile, the FAA is recalling some 1,700 aviation safety inspectors despite the ongoing partial shutdown.

Reuters reports that that an FAA spokesman said Tuesday that the agency is "recalling inspectors and engineers to perform duties to ensure continuous operational safety of the entire national airspace. We proactively conduct risk assessment, and we have determined that after three weeks it is appropriate to recall inspectors and engineers."

By the end of the week, the FAA says it will have 3,100 safety personnel on the job, including 2,200 inspectors compared to 500 inspectors last week.

The shutdown has stalled approval of new aircraft and new airline routes. It is also affecting the certification program for Gulfstream's new G600, according to the planemaker.

(Image from file)

FMI: Source report, Source report

Advertisement

More News

True Blue Power and Mid-Continent Instruments and Avionics Power NBAA25 Coverage

Mid-Continent Instruments and Avionics and True Blue Power ANN's NBAA 2025 Coverage... Visit Them At Booth #3436 True Blue Power Introduces New 45-watt Charging Ports for 14- and 2>[...]

ANN's Daily Aero-Term (10.15.25): En Route Automation System (EAS)

En Route Automation System (EAS) The complex integrated environment consisting of situation display systems, surveillance systems and flight data processing, remote devices, decisi>[...]

Aero-News: Quote of the Day (10.15.25)

“Our Kodiak aircraft family is uniquely designed to meet the rigorous demands of such deployments, bringing short takeoff and landing performance, robust cargo capacity and e>[...]

ANN's Daily Aero-Linx (10.15.25)

Aero Linx: Australian Society of Air Safety Investigators (ASASI) The Australian Society of Air Safety Investigators (ASASI) was formed in 1978 after an inaugural meeting held in M>[...]

NTSB Final Report: Jeremy S Lezin Just SuperSTOL

Left Main Landing Gear Struck A Bush, And The Right Wingtip Impacted The Ground Analysis: According to the pilot of the tailwheel-equipped airplane, he noticed that the engine oil >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC