Gulfstream Becomes First Part 91 Operator To Use New FAA Authorization Platform | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Wed, Sep 01, 2010

Gulfstream Becomes First Part 91 Operator To Use New FAA Authorization Platform

WebOPSS Streamlines Approval Process; Beneficial To Company, Customers

The Gulfstream Aerospace Corp. Flight Operations department has reduced the time it takes to receive a reduced vertical separation minimum (RVSM) Letter of Authorization (LOA) from two weeks to just a few days, according to the FAA.

The agency said Gulfstream Flight Ops is the first Part 91 operator to use the Web-Based Operators Safety System (WebOPSS) to process FAA-required operations documents, saving time for customers and the company. WebOPSS is the Internet platform for OPSS, an automated system that distributes standardized regulatory and policy requirements to the aviation community and collects and maintains operating authorizations for the FAA. Typical WebOPSS transactions involve the processing of documents such as an LOA or Master Minimum Equipment List (MMEL).

Gulfstream first used WebOPSS for an RVSM LOA for a Gulfstream G450 demonstrator. Without the RVSM LOA, the airplane would have been restricted from flying above FL290. Gulfstream has since used WebOPSS to process an RVSM LOA for a previously owned aircraft. LOAs are required by the FAA before an aircraft's RVSM capabilities can be demonstrated to customers. Usually, the LOA paperwork is sent back and forth, from operator to the FAA, through the mail. The entire process can take weeks.


G450 File Photo

 "The new system is a tremendous time savings for both parties - the FAA and Gulfstream," said Randy Gaston, vice president, Flight Operations, Gulfstream. "Our fleet changes regularly, so this new process will enable us to use the full operating envelope without being limited by lack of RVSM approval."

Besides streamlining the approval process, the benefits of WebOPSS include the ability to process authorizations from any location with Internet access and quick dissemination of FAA policies to operator and inspector communities. Digital signatures streamline the process for both the FAA and the operator.

FMI: www.faa.gov, www.gulfsream.com

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC