Boeing 747-8 Freighter Receives Expanded Type Inspection Authorization | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Wed, Jun 16, 2010

Boeing 747-8 Freighter Receives Expanded Type Inspection Authorization

First Intercontinental Passenger Fuselage Under Construction In Everett, WA 

The FAA granted expanded type inspection authorization (TIA) to Boeing for the 747-8 Freighter on June 11. This authorization clears the way for FAA personnel to participate in test flights and collect required data.


747-8 Freighter File Image

"This is a major step in our effort to test and certify the 747-8 Freighter for our customers," said Mo Yahyavi, vice president and general manager for the 747 program, Boeing Commercial Airplanes. "The airplane is performing well in the tests. We have demonstrated the airplane's readiness to move onto the next stage in the flight-test program through tests at a variety of speeds, altitudes and configurations."

With the issuance of TIA, the 747 program is beginning expanded certification testing. During this phase of testing, the extremes of the flight envelope are explored. Testing conditions include operations in hot and cold weather as well as takeoffs and landings at high-altitude airports. In addition, over-speed conditions, hard landings and engine-out conditions are tested.

"The airplane is handling beautifully," said Mark Feuerstein, 747 program chief pilot, Boeing Test and Evaluation. "It is a joy to fly."

The entire flight-test program calls for a total of about 3,700 hours of ground and air testing. The first 747-8 Freighter delivery is planned for the fourth quarter of this year.


747-8 Intercontinental Fuselage Assembly

In a related development, Boeing began fuselage assembly of the first 747-8 Intercontinental at the factory in Everett, WA, Monday. Mechanics loaded panels for the 31-foot, 8-inch  long front section of the new airplane into the assembly tool. The panels are part of section 41, the area of the fuselage that houses the flight deck on the upper deck and the forward passenger cabin on the main deck, an area that most airlines typically configure with first class seating.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (09.13.25): Center Weather Advisory

Center Weather Advisory An unscheduled weather advisory issued by Center Weather Service Unit meteorologists for ATC use to alert pilots of existing or anticipated adverse weather >[...]

Aero-News: Quote of the Day (09.13.25)

“HITRON embodies the Coast Guard’s spirit of innovation and adaptability. From its humble beginnings as a prototype program, it has evolved into a vital force in our co>[...]

ANN's Daily Aero-Linx (09.13.25)

Aero Linx: International Airline Medical Association (IAMA) The International Airline Medical Association (IAMA), formerly known as the Airline Medical Directors Association (AMDA)>[...]

Classic Aero-TV: Hover Camera Passport - A Gesture Controlled Selfie Drone

From 2017 (YouTube Edition): It’s So Simple to Operate, Anyone Can Do It… And We’re Not Kidding The drones were up and flying at the Consumer Electronics Show he>[...]

Airborne-NextGen 09.09.25: Textron Nixes ePlane, Joby L/D Flt, Swift Approval

Also: Space Command Moves, Alpine Eagle, Duffy Names Amit Kshatriya, Sikorsky-CAL FIRE Collab Textron eAviation is putting the development of its Nexus electric vertical takeoff an>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC