X-43 Free Flight Delayed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Fri, Nov 05, 2004

X-43 Free Flight Delayed

Mach 10 Flight Now Scheduled For November 15th

Due to weather concerns and scheduling conflicts for use of the US Navy's test range off the Southern California coast, the third and final flight of the X-43A hypersonic research aircraft from NASA's Dryden Flight Research Center has been rescheduled for no earlier than Monday, Nov. 15. If test range availability or weather conditions preclude conducting the mission on that date, Tuesday, Nov. 16 is being retained as a backup date for the flight.

The mission is intended to flight-validate the operation of the X-43A's supersonic-combustion ramjet - or "scramjet" - engine at an airspeed of almost Mach 10, 10 times the speed of sound, or about 6,800 mph. Technicians are preparing the research vehicle and its rocket booster for mating to the B-52B launch aircraft, and project engineers are completing control room training for the mission, simulating both a nominal mission and a variety of potential contingencies that could arise during the flight.

The final X-43A mission is also expected to be the last research mission for NASA's venerable B-52B "mothership" heavy launch aircraft, which is due to be retired in the near future after almost 50 years of service.

As a result of the flight delay, a pre-flight news media briefing at NASA Dryden for the final X-43A research flight will be rescheduled for the week of Nov. 8 - 12, with the exact date yet to be determined.

FMI: www.nasa.gov/missions/research/x43-main.html

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC