Dextre Receives Tool Belt, 'Eyes' On Third Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Tue, Mar 18, 2008

Dextre Receives Tool Belt, 'Eyes' On Third Spacewalk

ISS Will Soon Have Its Own Robot

Dextre's good to go... now, it just needs its "eyes" and "hands." STS-123 Mission Specialists Rick Linnehan and Robert L. Behnken were hard at work Monday evening, outside the orbiting complex formed by the docked International Space Station and space shuttle Endeavour.

The two astronauts began the third spacewalk of the STS-123 mission at 1851 EDT. The primary goal of the excursion was the outfitting of Dextre, the final element of the station’s Mobile Servicing System. As ANN reported, Dextre was powered on Sunday morning, after some early stumbling blocks.

With Mission Specialist Mike Foreman coordinating spacewalk activities from inside the orbiting complex, Linnehan and Behnken installed a spare parts platform and tool handling assembly for Dextre. Among other tasks, they also checked out and calibrated Dextre’s end effector, and moving some spare parts.

As part of the third of five planned spacewalks during Endeavour's stay at the ISS, Dextre also received its "eyes" -- two cameras, located at waist-level on the 11.5-foot robot, according to The Canadian Press. In addition, the spacewalkers installed the MISSE-6 materials experiment on the outside of the European Space Agency’s Columbus laboratory.

Space shuttle Endeavour Pilot Gregory H. Johnson and Expedition 16 Flight Engineer Garrett Reisman operated the station’s robot arm during the spacewalk.

Behnken and Foreman are also slated to carry out the mission’s fourth spacewalk at 1828 EDT. Thursday. The two will perform tasks that include a shuttle tile repair test and change out of a circuit breaker on the station.

FMI: www.nasa.gov

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC