FAA Proposes $2.4M Civil Penalty Against Cessna Over Corvalis Wing Failure | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Thu, Sep 22, 2011

FAA Proposes $2.4M Civil Penalty Against Cessna Over Corvalis Wing Failure

Corvalis Composite Issues Required Emergency Landing

Ouch... The fallout from an incident (and near-accident) that occurred to a Cessna Corvalis, last year, is likely to be an expensive one. The FAA is proposing an aggressive $2,425,000 civil penalty against Cessna Aircraft Co. after carbon composite parts of the wing of one of its aircraft came apart during flight.

On Dec. 6, 2010, an FAA test pilot performing a production audit test flight in a Cessna Corvalis experienced a failure of the skin on the left wing. About seven feet of the left wing skin separated from the forward spar and damaged a fuel tank. The FAA notice explains that the 'spar is a beam-like structure inside the wing and is a principal load-bearing component.'

The pilot made an emergency landing at the Independence, KS, airport.

Subsequently, the FAA issued emergency airworthiness directives grounding 13 specific Corvalis aircraft that used wings and parts produced in Cessna's Chihuahua, Mexico, plant between Dec. 17, 2009, and Dec. 16, 2010. FAA investigators determined that the wing skin separated from the spar due to excessive humidity in the factory that prevented the bonded materials from curing properly.

The FAA alleges that Cessna failed to follow its FAA-approved quality control system when it manufactured the wings on the damaged airplane, as well as 82 additional parts, in the Chihuahua factory. The manufacturer has since made improvements to the plant.

"Safety is our highest priority," said U.S. Transportation Secretary Ray LaHood. "We want to ensure that manufacturers are vigilant when it comes to aviation safety. There can be no exceptions."

"Quality control is a critical part of the aircraft manufacturing process and has to detect problems before planes leave the factory," said FAA Administrator Randy Babbitt. "Manufacturers have to ensure that all the details are followed all of the time."

The Corvalis is a high-performance four-seat single-engine general aviation aircraft. It uses a significant number of composite parts and structures. Cessna has 30 days from the receipt of the FAA's enforcement letter to respond.

FMI: www.faa.gov, www.cessna.com

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC