Boeing Begins Final Assembly Of First 737 MAX | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Wed, Sep 16, 2015

Boeing Begins Final Assembly Of First 737 MAX

Mechanics Complete Wing-To-Body Join

Boeing employees in Renton, WA have started final assembly on schedule of the first 737 MAX 8, the first member of Boeing’s new, single-aisle family.

“We continue to meet our plan on the 737 MAX program thanks to the dedication of our employee team and our suppliers,” said Keith Leverkuhn, vice president and general manager, 737 MAX program, Boeing Commercial Airplanes. “We have a lot more work still ahead of us but we’re very pleased with our progress to date.”

After the first fuselage arrived on Aug. 21 from Spirit Aerosystems in Wichita, Kan, mechanics began installing flight systems and insulation blankets.

“It’s an honor. There is only one crew that gets to be that first crew that builds that airplane. I’m really excited,” said Sean Christian, 737 MAX Electrical team lead. 

Crews next moved the fuselage to the wing-to-body join position on the new production line where the first MAXs will be built. Mechanics then attached the wings to the body of the airplane.

The wings feature Boeing’s new Advanced Technology winglets. Designed exclusively for the 737 MAX, they will give customers up to 1.8 percent additional fuel-efficiency improvement over today’s inline winglet designs.

“Seeing the new winglet design we validated in the wind tunnel years ago now on the first new airplane is incredible,” said Leverkuhn. “It’s just one of the features that differentiate the 737 MAX and make it an amazingly fuel-efficient machine.”

Boeing will build the first 737 MAXs exclusively on the new production line in the Renton factory. Once mechanics prove out the production process, the team will extend MAX production to the other two final assembly lines in Renton.

“The opening of a brand new production line in Renton increases our flexibility and capacity, allowing this incredible team to continue to meet our customers’ need for the world’s most reliable single-aisle airplanes, well into the future,” said Scott Campbell, vice president and general manager, 737 program and Renton site leader, Boeing Commercial Airplanes.

(Images provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (09.13.25): Center Weather Advisory

Center Weather Advisory An unscheduled weather advisory issued by Center Weather Service Unit meteorologists for ATC use to alert pilots of existing or anticipated adverse weather >[...]

Aero-News: Quote of the Day (09.13.25)

“HITRON embodies the Coast Guard’s spirit of innovation and adaptability. From its humble beginnings as a prototype program, it has evolved into a vital force in our co>[...]

ANN's Daily Aero-Linx (09.13.25)

Aero Linx: International Airline Medical Association (IAMA) The International Airline Medical Association (IAMA), formerly known as the Airline Medical Directors Association (AMDA)>[...]

Classic Aero-TV: Hover Camera Passport - A Gesture Controlled Selfie Drone

From 2017 (YouTube Edition): It’s So Simple to Operate, Anyone Can Do It… And We’re Not Kidding The drones were up and flying at the Consumer Electronics Show he>[...]

Airborne-NextGen 09.09.25: Textron Nixes ePlane, Joby L/D Flt, Swift Approval

Also: Space Command Moves, Alpine Eagle, Duffy Names Amit Kshatriya, Sikorsky-CAL FIRE Collab Textron eAviation is putting the development of its Nexus electric vertical takeoff an>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC