GE Aviation Breaks Ground For New $51 Million R&D Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Mon, Apr 18, 2011

GE Aviation Breaks Ground For New $51 Million R&D Center

Facility Being Built In Ohio's "Aerospace Hub"

GE Aviation broke ground Thursday on its new Electrical Power Integrated Systems Research and Development Center (EPISCENTER) on the University of Dayton campus in Dayton, Ohio. The $51 million center will be built on about eight acres on the University of Dayton's campus on River Park Drive.

"GE's new R&D center will be the southern anchor to the Ohio Aerospace Hub of Innovation and Opportunity," said Lorraine Bolsinger, president and CEO of GE Aviation Systems. "This location and future facility will help all stakeholders in attracting high caliber engineering talent. The center will be a catalyst for new contracts and products resulting in job growth at the EPISCENTER and at GE locations such as Vandalia."

The University is working with CityWide Development Corp. to build the facility to GE's specifications. GE is finalizing a long-term lease agreement with the University of Dayton and CityWide. The 120,000 square foot facility is expected to be completed by the third quarter of 2012 and operational by the end of 2012.

"Without a doubt, it's extraordinary for a Fortune 100 corporation to build a multi-million-dollar research facility on a college campus in today's economic climate," said Daniel J. Curran, president of the University of Dayton. "Our researchers will work side by side with GE scientists and engineers to develop electrical power systems and technologies. The applications are numerous — from next-generation power systems for aircraft to longer-range electric cars. Even smarter utility power grids for more efficient delivery of electricity."

The center's close proximity to Wright-Patterson Air Force Base and the University of Dayton Research Institute is important in order to provide significant new support to the Air Force Research Labs and the University of Dayton. The University's researchers will work with GE to develop and deploy computer modeling, simulation and analysis of advanced, dynamic electric power systems design and controls.

The center will be directed at several markets including end-to-end electrical power starter/ generation, conversion, distribution, and load technologies for civil and military aerospace applications.

In November 2010, GE announced it would build the EPISCENTER on the University of Dayton campus. The project was enabled by an Ohio Third Frontier capital grant for up to $7.6 million. While GE recognized the value of locating in the Aerospace Hub, making such a decision competitive with other options required significant collaboration between UD, GE, the City of Dayton, Montgomery County and CityWide Development Corporation. It also demonstrates the value of the Aerospace Hub in attracting jobs and providing a focus for economic development efforts.

GE says the EPISCENTER will complement GE Aviation's new Electrical Power Integrated Center (EPIC) located in Cheltenham, UK, which will be operational this year. Together, these two research centers will augment GE Aviation's existing research and development capabilities, further enabling collaborative research and driving innovation.

FMI: www.geae.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC