Boeing 747 To Continue As Air Force One Platform | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Fri, Jan 30, 2015

Boeing 747 To Continue As Air Force One Platform

Secretary Of The Air Force Says 747-8 Will Be The Next Executive Aircraft

Secretary of the Air Force Deborah Lee James, in coordination with the Undersecretary of Defense for Acquisition, Technology and Logistics Frank Kendall, has determined the Boeing 747-8 will serve as the next presidential aircraft, commonly known as Air Force One.

“The presidential aircraft is one of the most visible symbols of the United States of America and the office of the president of the United States,” James said. “The Boeing 747-8 is the only aircraft manufactured in the United States (that), when fully missionized, meets the necessary capabilities established to execute the presidential support mission, while reflecting the office of the president of the United States of America consistent with the national public interest.”

Analyses of the capability requirements conclude a four-engine, wide-body aircraft is required to meet the needs of the Air Force One mission. Market research determined there are two four-engine platforms that could meet the requirements; the 747-8 manufactured by Boeing in the state of Washington, and the A380 manufactured by Airbus in Toulouse, France.

The decision, made official through a Determinations and Findings document, authorizes the commercial aircraft purchase by other than full and open competition. This decision, in conjunction with the notification of the Air Force’s intent to award a sole source contract to Boeing for the modification of the 747-8, allows discussions with Boeing that will likely lead to a contract for the aircraft platform as well as the modifications necessary to missionize the aircraft.

“This decision is not a contract award to procure 747-8 aircraft,” said Col. Amy McCain, the Presidential Aircraft Recapitalization (PAR) program manager. “We still need to finalize the overall acquisition strategy and conduct risk-reduction activities with Boeing to inform the engineering and manufacturing development contract negotiations that will define the capabilities and cost.”

The Air Force wants to own enough of the technical baseline to permit competition for sustainment throughout the aircraft’s planned 30-year life cycle. Competition can keep costs down, spur innovation and provide options.

“We are committed to incorporating competition for subsystems of the missionized aircraft as much as practicable, and will participate substantively in any competitions led by the prime contractor,” James said.

“The current fleet of VC-25 presidential aircraft has performed exceptionally well, a testament to the Airmen who support, maintain and fly the aircraft,” James said. “Yet, it is time to upgrade. Parts obsolescence, diminishing manufacturing sources and increased down times for maintenance are existing challenges that will increase until a new aircraft is fielded.

“The Air Force provides the president with safe and reliable air transportation with high levels of security and communication capability as the alternate airborne White House,” she added. “This platform will meet the requirements necessary to provide that level of service for future presidents.”

The secretary is clear affordability will be a key element of the PAR program.

“The program will use multiple strategies, such as the use of proven technologies and commercially certified equipment, to ensure the program is as affordable as possible while still meeting mission requirements,” James said. “We will insist upon program affordability through cost conscious procurement practices.”

(Stock image)

FMI: www.af.mil, www.boeing.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC