NASA's Space Shuttle Discovery Set To Roll To Launch Pad | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.14.25

Airborne-NextGen-07.15.25

AirborneUnlimited-07.16.25

Airborne-FlightTraining-07.17.25

AirborneUnlimited-07.11.25

Sat, Apr 02, 2005

NASA's Space Shuttle Discovery Set To Roll To Launch Pad

Space Shuttle Discovery is set to roll out to Launch Pad 39B at NASA's Kennedy Space Center (KSC), Fla. First motion is currently targeted for 12:01 a.m. EDT Tuesday, April 5.

The fully-assembled Space Shuttle Vehicle, or "stack," -- consisting of the orbiter, External Tank (ET) and twin Solid Rocket Boosters (SRBs) -- will be mounted on the Mobile Launcher Platform and delivered to the pad via a crawler transporter. The four-mile journey from the Vehicle Assembly Building (VAB) to the pad will take about six hours.

Discovery's initial move to Launch Pad 39B will be covered live on NASA Television. Live commentary will begin at the first motion of the crawler transporter and continue for about 30 minutes.

NASA TV is available via satellite in the continental U.S. on AMC-6, Transponder 9C, C-Band, at 72 degrees west longitude. The frequency is 3880.0 MHz. Polarization is vertical, and audio is monaural at 6.80 MHz. In Alaska and Hawaii, NASA TV is available on AMC-7, Transponder 18C, C-Band, at 137 degrees west longitude. The frequency is 4060.0 MHz. Polarization is vertical, and audio is monaural at 6.80 MHz. NASA TV is also available on the Internet at www.nasa.gov/ntv.

Launch of Discovery on its Return to Flight mission, designated STS-114, is targeted for May 15 with a launch window that extends to June 3.

During its 12-day mission, Discovery's seven-person crew will test new hardware and techniques to improve Shuttle safety, as well as deliver supplies to the International Space Station.

Discovery was moved from Orbiter Processing Facility on March 29 to the VAB and attached to its propulsion elements, a redesigned ET and twin SRBs.

In preparation for rollout to the launch pad, work in the VAB included the installation of a new digital camera, testing electrical and mechanical attachments between the orbiter and ET, and umbilical checks.

FMI: www.nasa.gov/returntoflight, www.nasa.gov/ntv

Advertisement

More News

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

Classic Aero-TV: The PB4Y-2 Privateer - A Priceless Aero-Treasure

From 2015 (YouTube Version): Oshkosh Reveals Many Treasures... Including Old Warbirds Full Of History While at EAA AirVenture 2015, ANN News Editor, Tom Patton, ventured out to vis>[...]

Aero-News: Quote of the Day (07.14.25)

"The aircraft achieved the maximum recorded airspeed of 180 Knots IAS at about 08:08:42 UTC and immediately thereafter, the Engine 1 and Engine 2 fuel cutoff switches transitioned >[...]

ANN's Daily Aero-Term (07.14.25): Temporary Flight Restriction (TFR)

Temporary Flight Restriction (TFR) A TFR is a regulatory action issued by the FAA via the U.S. NOTAM System, under the authority of United States Code, Title 49. TFRs are issued wi>[...]

ANN's Daily Aero-Linx (07.14.25)

Aero Linx: Aviation Without Borders Aviation Without Borders, a leading humanitarian aviation charity, uses its aviation expertise, contacts and partnerships to enable support for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC