Bombardier Feeling The Heat | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Mon, Sep 27, 2004

Bombardier Feeling The Heat

Company under pressure to develop new jets to compete with larger regional jets

Bombardier is feeling the heat these days -- not from the weather, but from the competition. Airline industry analysts are telling the company that if they do not move to stay in the market with new mid-size jets, they risk being left behind... permanently.

"They're between a rock and a hard place. They really have to do this," said William Dane, senior aviation analyst with Forecast International/DMS Inc. in Newtown, Conn. told the Canadian Globe and Mail.

The problem for Bombardier is that the market is shifting. Airlines are moving to larger, more economical regional jets in the 100+ seat category, and Bombardier doesn't have a product in that niche. Either it develops one, or it misses the opportunity, which could have disastrous consequences for the company.

That's the rock. The hard place is that the cost of developing the jet needed to compete in that arena is estimated to be some $2 billion, up from the $1.17 billion to $1.56 billion that was originally estimated back in January. Three years ago, the company cancelled the BRJ-X project for a 100+ seat regional jet. Since then, costs have gone up significantly. "That [original] figure was based on the BRJ-X experience and was for one single aircraft," Mr. Macdonald said.

Since then Bombardier has also brought in a new person to head the new aircraft program, Gary Scott, formerly of the Boeing Co. He has recommended the creation of a platform for a family of four jets, and that has bumped up the costs as well. On top of that, the $2 billion estimate doesn't include the cost of developing a high efficiency engine that will give the jet the range it needs to compete in the market. Fortunately, that cost is expected to be absorbed by the companies that design and make the engines. Bombardier does not have a presence in that market.

The executive team at Bombardier are resisting the pressure by arguing that they should not proceed with a new jet program unless they can offer something other than a "me too" product. They feel that if that much money is going to be spent, it has to be to develop an aircraft that an offer better operating costs than what's out there right now.

Michael Boyd, head of Evergreen, Colo.-based industry consultants Boyd Group, says he's not buying that story. "I'm betting that if [Bombardier] doesn't do anything, it's out of the airliner business," he said. "Taking that risk is worth $2-billion."

To soften the tab for such a project, the company is lobbying the Canadian and British governments for financial assistance. It's also making the same pitch to Queben and Ontario. CEO Paul Tellier says he expects Bombardier should assume one third of the risk, with suppliers and the government assuming the other two thirds.

FMI: www.bombardier.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC