Dassault Falcon 10X Continues the March Towards Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Oct 19, 2022

Dassault Falcon 10X Continues the March Towards Production

Initial Subassemblies and Parts Underway as Testing Regimen Accelerates

Dassault Aviation announced the start of their ambitious new Falcon 10X’s initial production run, declaring the manufacture of long-lead parts for the upcoming ultra-long-range business jet.

“All the elements for another great Falcon are literally coming together in our various production facilities,” remarked Dassault Aviation Chairman and CEO Eric Trappier. “This new aircraft, the largest purpose-built business jet on the market, will embody the latest technology and set a new benchmark for passenger experience.”

First, Dassault has completed the landing gear, now completed and awaiting assembly as the first fully representative composite wing is readied for static and fatigue testing. While underway, the first ground testing has begun for the Falcon’s first complete power plant as installed with its new nacelle design. 

Dassault will take a “new approach to ground testing” this time around, hoping to “demonstrate the maturity of all systems well before the aircraft even takes to the air”. Two multi-system test benches at the company’s Istres, France flight test center will be used for the campaign, equipped with a full flight deck and subsystems simulators representative of those used on the Falcon 10X.

The benches will allow testing and verification of avionics, engine controls, flight controls, hydraulics, electrical distribution, braking, fire protection and other sundry aircraft systems as Dassault tries to shake out any mysteries or issues in the aircraft before full series production. 

Rolls-Royce’s new facility also broke ground near the final assembly line in Bordeaux-Mérignac, which will eventually allow them to support production of their Pearl 10X. The flight test campaign will take place using a Rolls-Royce flying test bed, logging more than 1,000 hours to date on 100% sustainable aviation fuel. So far, they report confidence in the Pearl’s reliability, noting it has met its performance requirements in providing more than 18,000 pounds of thrust. 

FMI: www.dassaultfalcon.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC