Air Force Officials Announce C-27J Aircraft Basing Proposal | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Mon, Oct 18, 2010

Air Force Officials Announce C-27J Aircraft Basing Proposal

Montana Base Is The Preferred 7th Operational Location

Air Force officials announced Wednesday that Great Falls International Airport, MT, is the preferred alternative to be the seventh operational location for bedding down four C-27J Spartan aircraft.

Secretary of the Air Force Michael Donley and Chief of Staff of the Air Force Gen. Norton Schwartz announced in July two candidate bases that included Boise Air Terminal Air Guard Station, Idaho, and Great Falls International Airport. Site survey teams evaluated the two candidate sites for feasibility, timing, cost and planning purposes to meet initial operational capability requirements.

The C-27J is a twin turboprop engine aircraft designed to meet the Air Force requirement for a rugged, medium size airland transport. The C-27J gives U.S. military troops a unique, short-take-off-and-landing capability, providing access to airstrips otherwise unreachable by fixed-wing aircraft.

The first six operational bases announced in July 2008 were Martin State AGS, Baltimore, MD; W.K. Kellogg Airport, Battle Creek, MI; Bradley International Airport AGS, Bradley, CT; Hector Field AGS, Fargo, ND; Mansfield Lahm Regional Airport, Mansfield, OH; and Key Field AGS, Meridian, MS.

The final basing decision for the seventh operational base is pending completion of environmental impact analysis, expected by May 2011. A final announcement is expected in June 2011 with aircraft delivery expected in mid-2014.

FMI: www.af.mil

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC