Astronauts Check Suits Following Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Fri, Jul 03, 2020

Astronauts Check Suits Following Spacewalk

Wednesday’s Spacewalk Swapped Batteries And Route Cables On The Station’s Starboard-6 Truss Structure

Spacesuit checks were on the schedule Thursday for the Expedition 63 crew following a spacewalk to replace aging batteries on the International Space Station. The orbital residents also juggled a variety of science activities.

NASA astronauts Chris Cassidy and Bob Behnken are back to work now after Wednesday’s spacewalk to swap batteries and route cables on the station’s Starboard-6 truss structure. The duo recharged batteries and refilled water tanks inside their U.S. spacesuits. Flight Engineer Doug Hurley also joined the pair in the afternoon for eye scans with an ultrasound device.

All three astronauts called down to Mission Control today and briefed specialists with the results of the mission’s second spacewalk. Station managers will assess the orbital lab’s upgraded power status before scheduling more battery swap spacewalks later this month.

Cassidy also configured cables on a specialized furnace before uploading new software to the high-temperature research device. Hurley worked with experiment hardware that seeks to better control the separation of blood cells and plasma to improve medical diagnostic devices.

Cosmonauts Anatoly Ivanishin and Ivan Vagner partnered up Thursday morning for cardiac research. The duo is studying how the heart reacts to a unique suit that reverses the flow of blood towards the head caused by weightlessness. The pair then split up for life support maintenance and radiation checks.

FMI: www.nasa.gov

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC