Kratos Completes 3rd Milestone In Critical USAF Satellite Deployment Study | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.23.24

Airborne-NextGen-10.01.24

Airborne-Unlimited-10.02.24

Airborne-AffordableFlyers-10.03.24

Airborne-Unlimited-09.27.24

Sat, Nov 10, 2018

Kratos Completes 3rd Milestone In Critical USAF Satellite Deployment Study

Looking Into Migration Of The Command And Control System For Over 20 Spacecraft

Kratos Defense & Security Solutions has successfully completed the third phase of a pathfinder study for migrating the Command and Control System – Consolidated (CCS-C) ground system to the Enterprise Ground Services (EGS) architecture. CCS-C currently operates a fleet of over 20 Military Satellite Communications (MILSATCOM) satellites in four different constellations.

In phase 3, Kratos demonstrated the automated deployment of the MILSATCOM EGS (MEGS), using virtualized applications on the Space and Missile Systems Center (SMC)-provided Cooperative Research and Development Agreement (CRADA) Supply Chain Risk Management (SCRM) infrastructure hosted at the Space Management Battle Lab (SMBL).  After successful deployment, the team demonstrated Kratos’ web-based user interface and automation capabilities. Traditionally, ground system capabilities take months or even years to deploy and test, however, with automated software deployment and dynamic allocation of resources employed by the Kratos team based on the EGS principles of deploying in a modern IT environment, the demonstration took less than ten minutes. This dynamic allocation of ground resources demonstrates the portability, resiliency and elasticity of the MEGS.

EGS is a critical enabling technology for the Air Force’s Space Enterprise Vision (SEV) focused on a sustainable, resilient space architecture that can respond to emerging threats and protect space-based assets. When implemented, EGS will result in a best of breed, service-based ground architecture for all Air Force spacecraft that will enable Air Force Space Command (AFSPC) to fight and win a war that extends into space. AFSPC is implementing EGS with prototyping activities to mature the concepts, technologies, EGS standards, and transition paths for legacy and future ground systems.

The Kratos study for MILSATCOM is a 27-month effort that consists of four phases and is an essential step in the evolution of CCS-C to exploit the benefits of EGS. Phase 3 concluded on 12 July with a successful demonstration. Phase 4 will be completed in December, 2018.

"This demonstration of phase three illustrates the capability of an EGS environment to be both resilient and elastic," said Larry Lind, Vice President, Kratos Federal Solutions Group. "Kratos’ involvement with EGS goes beyond the CCS-C/EGS interoperability study as we are actively involved in defining and refining the standards that will make EGS a reality.”

(Image provided with Kratos news release)

FMI: www.kratosdefense.com

Advertisement

More News

ANN's Daily Aero-Term (10.02.24): Execute Missed Approach

Execute Missed Approach Instructions issued to a pilot making an instrument approach which means continue inbound to the missed approach point and execute the missed approach proce>[...]

Aero-News: Quote of the Day (10.02.24)

“NORAD aircraft flew a safe and disciplined intercept of Russian Military Aircraft in the Alaska ADIZ... The conduct of one Russian Su-35 was unsafe, unprofessional, and enda>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Air Tractor Inc AT-602

Airplane Was Flying West Along The North Edge Of The Field When The Outboard 3 Ft Of The Right Wing Impacted A Power Transformer On September 5, 2024, about 1014 mountain daylight >[...]

NTSB Prelim: Boeing A75L3

The Wreckage Was Located At The Base Of An Approximate 100 Ft Tall Tree On September 6, 2024, about 1259 Pacific daylight time, a Boeing A75L3, N53466, was substantially damaged wh>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC