F-35 Flight Testing Suspended For Technical Problems | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Oct 05, 2010

F-35 Flight Testing Suspended For Technical Problems

Fuel Pump Software, Inlet Door Hinges Questioned. Flights Resume Tuesday

The Pentagon late last week suspended flight testing of all variants of the F-35 Lightning II Joint Strike Fighter after problems were discovered with software that controls the airplane's three fuel boost pumps. An additional issue was discovered with the auxiliary inlet door hinge during a post-flight inspection of the BF-1 STOVL aircraft, and short takeoff/vertical landing mode testing has also been prohibited while that problem is addressed.


File Photo

The aux inlet doors are just aft of the lift fan and open to allow additional air to enter the engine during STOVL operations such as hover and slow flight.

The Air Force Times reports that the software problem affects the fuel pumps in all three models of the JSF was discovered during lab testing. Pentagon spokesperson Cheryl Irwin said that the problem "could have possibly triggered a shutdown on the three boost pumps, which could potentially cause an engine stall.” While she said a simultaneous shutdown of all three pumps would be very unlikely, “prudence dictated a suspension of operations, temporarily, until the fuel boost pump signal timing was corrected.”


STOVL F-35

Lockheed Martin spokesperson John Kent said that flight testing was set to resume Tuesday after updated software was delivered and installed over the weekend, but that STOVL testing would not resume until the root cause of the hinge issue has been identified.

FMI: www.lockheedmaritn.com, www.defense.gov

 


Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC