NASA Reschedules Test of Max Launch Abort System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Jun 12, 2009

NASA Reschedules Test of Max Launch Abort System

Because of weather concerns and launch site preparation needs, NASA has rescheduled the test launch of the Max Launch Abort System, or MLAS, to no earlier than June 20 at the agency's Wallops Flight Facility on Wallops Island, Va. The launch window June 20 extends from approximately 0545 to 0815 EDT. The launch had been scheduled previously for June 15.

The unpiloted test is part of an effort to design a system for safely propelling future spacecraft and crews away from hazards on the launch pad or during the climb to orbit. This system was developed as an alternative concept to the launch abort system chosen for NASA's Orion crew capsule. Orion, part of a new spacecraft system being developed by NASA's Constellation Program, is undergoing design reviews in preparation for flying humans to the International Space Station in 2015 and, later, to the moon.

MLAS is being tested to provide experience in flight testing a spacecraft to NASA's Engineering and Safety Center, which leads the project from NASA's Langley Research Center in Hampton, Va.

The 33-foot-high MLAS vehicle will be launched to an altitude of approximately one mile to simulate an emergency on the launch pad. A full-scale mockup of the crew module will separate from the launch vehicle and parachute into the Atlantic Ocean.

FMI: www.nasa.gov/centers/wallops/missions/mlas.html, www.nasa.gov/constellation

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC