RV-10 Kits To Be Produced With Final-Size Holes Drilled | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Aug 04, 2020

RV-10 Kits To Be Produced With Final-Size Holes Drilled

RV-10 Construction Just Got A LOT Easier

Van’s Aircraft has initiated the process of phasing in the production of final-size, matched-hole RV-10 parts. Until now, all parts for the RV-10 have been produced with slightly undersized holes, which the builder must up-size with a drill and then debur prior to assembly.

The company notes that, "We will be transitioning the RV-10 kit to final-sized holes, much like the RV-14 and RV-12iS kits. There is no increase in kit prices associated with this planned change.

We are excited to remove a portion of the initial work that builders need to perform on certain parts of the RV-10 airframe assembly with this change. Aircraft parts with final-size holes may be dimpled and then assembled right out of the box, after deburring the edges of each part as needed. This removes the need to first cleco the parts together, drill them to size in assembly, then disassemble and debur.

This manufacturing transition will take place over the next several months (we anticipate completing the transition sometime in early 2021). During the transition period, customers may receive some portion of their parts with final-sized holes and others without. Van’s will mark delivered kit parts to make the builder aware whether each part needs to be final-drilled and deburred, or not. We will also include instructions for the builder explaining how to identify which kit parts are/are not final-sized."

FMI: www.vansaircraft.com

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC