OSIRIS-REx Return Investigation Complete | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Fri, Dec 08, 2023

OSIRIS-REx Return Investigation Complete

Drogue Failure Result of "Inconsistent Wiring Label Definitions"

A recent return mission carrying samples from the asteroid Bennu raised eyebrows at NASA when a drogue chute failed to deploy during the landing sequence.

During the return of the OSIRIS-REx mission, a drogue was supposed to deploy at 100,000 feet to stabilize and slow the capsule during a 5-minute descent down to 10,000 feet. Instead, the signal triggered a different reaction at 100,000', jettisoning the parachute prior to it even deploying. With its retention cord cut, the main parachute was forced to take the entire deceleration load on its own. Luckily, NASA says, the margins as designed were sufficient to protect the Bennu sample.

The culprit for the drogue mishap turns out to be inconsistent verbiage in the use of "main" between two different subsystems. "On the signal side, “main” meant the main parachute. In contrast, on the receiver side “main” was used as a reference to a pyrotechnic that fires to release the parachute canister cover and deploy the drogue. Engineers connected the two mains, causing the parachute deployment actions to occur out of order," said the NASA investigation.

From here, the system will be tested again in situ, using the same hardware that misfired on the OSIRIS mission. The sample remains safely nestled in "one of the glove boxes inside the Johnson Space Center", awaiting the curation team's attention. Once complete, the equipment can be turned over for testing.

FMI: www.nasa.gov

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC