AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Dec 05, 2017

AD: Airbus Airplanes

AD NUMBER: 2017-24-09

PRODUCT: Certain Airbus Model A300 B4-600, B4-600R, and F4-600R series airplanes, and Model A300 C4- 605R Variant F airplanes (collectively called Model A300-600 series airplanes); and Airbus Model A310 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-20-11, which applied to the aircraft listed above.

AD 2016-20-11 required repetitive inspections of the external area of the aft cargo door sill beam for cracking, repetitive inspections for fatigue cracking of the cargo door sill beam, lock fitting, and torsion box plate, and repair if necessary.

This new AD retains the inspections for cracking, and repair if necessary; and requires reinforcement of the aft cargo door sill beam area. This AD was prompted by the development of a reinforcement modification of the aft cargo door sill beam area, which constitutes terminating action for the repetitive inspections.

COST: The FAA estimates that this AD affects 75 airplanes of U.S. registry. The cost of compliance is estimated to be $1,020 per inspection cycle per aircraft retained under the previous AD; Up to $102,670 per aircraft for parts and labor for modifications required under the new AD, and; $85 per inspection cycle per aircraft for reporting retained under the previous AD.

DATES: This AD is effective January 5, 2018.

FMI: AD

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC