Boeing Moves 787 Static Test Airframe To Testing Rig | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Apr 26, 2008

Boeing Moves 787 Static Test Airframe To Testing Rig

Stress Testing To Start This Summer On Dreamliner

It was a small trip, but also a major leap. On Friday, Boeing moved the 787 Dreamliner static test airframe from its Final Assembly facility in Everett, WA to its structural test rig, located only 1,000 feet away from Final Assembly at the Everett factory.

While some assembly remains to be completed on the static airframe, Friday's move represents the imminent start of static testing of the first composite-bodied airliner. Test set up is expected to begin immediately, with tests commencing this summer.

"During static tests we apply loads to the airplane structure that simulate both normal operation as well as extreme flight conditions," said Randy Harley, vice president of Engineering & Technology for the 787 program. "We monitor the airplane to confirm analytical predictions and make sure the structure holds up to these conditions."

Boeing also notes movement of the static airframe clears the way to begin assembly of the third 787 to enter the flight test program. Most pieces of the third airplane arrived in Everett earlier this month.

All assemblies for Airplane #3 are now in Everett, and the airplane will be loaded into the first position of Final Assembly early next week.

FMI: www.boeing.com

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC