Next Ariane 5 Mission Enters Payload Integration Phase | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Sep 05, 2014

Next Ariane 5 Mission Enters Payload Integration Phase

Heavy-Lift Mission Scheduled For Launch Next Week

Payload integration is underway for Arianespace’s upcoming heavy-lift Ariane 5 mission, which is scheduled for next week from French Guiana with two commercial telecommunications satellites: MEASAT-3b and Optus 10.

Recent activity at the Spaceport included initial steps in creating the dual-payload “stack,” with MEASAT-3b riding in the upper position.  This involved installing the relay platform – manufactured by Airbus Defence and Space – atop Ariane 5’s SYLDA dispenser system in the launcher’s Final Assembly Building.  

MEASAT-3b was then encapsulated by Ariane 5’s ogive-shaped payload fairing, completing the payload stack’s upper portion and readying it for positioning over Optus 10 after this spacecraft is installed atop the launcher.

During the Ariane 5 mission, which is set for the evening of September 11, MEASAT-3b will be released first into geostationary transfer orbit, followed by separation of the SYLDA dispenser – enabling Optus 10’s subsequent deployment.

MEASAT-3b is equipped with 48 high-power Ku-band transponders to expand direct-to-home broadcasting and VSAT (very small aperture terminal) services across Malaysia, India, Indonesia and Australia.

Optus 10, which was built by SSL (Space Systems/Loral) for Australian telecommunications service provider Optus, has been fueled at the Spaceport in the S5 payload preparation facility.  This satellite is outfitted with 24 Ku-band transponders to provide direct TV broadcast, internet connectivity, telephone and data transmission services for Australia and New Zealand.

The Ariane 5 mission with MEASAT-3b and Optus 10 is designated Flight VA218 in Arianespace’s launcher family numbering system. It will be the fourth launch of the heavy-lift workhorse from French Guiana in 2014.

(Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC