AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Apr 19, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-07-20

PRODUCT: Certain Boeing Model MD-11 and MD-11F airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2014-03-07, which applied to the aircraft listed above.

AD 2014-03-07 required inspecting certain locations of the wire bundles of the center upper auxiliary fuel tank for damage, and corrective action if necessary. AD 2014-03-07 also required installing nonmetallic barrier/shield sleeving, new clamps, new attaching hardware, and a new extruded channel.

This AD adds certain inspections and expands the applicability. This AD was prompted by the determination that it is necessary to require an inspection of the wire bundles for damage at certain center upper auxiliary fuel tank locations on certain airplanes.

DATES: This AD is effective May 21, 2018.

COST: The FAA estimates that this AD affects 125 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspection/installation [retained actions from AD 2009-26-16, Amendment 39-16155 (74 FR 69249, December 31, 2009)]: $29,988 to $43,475 per inspection cycle per aircraft for parts and labor.
  • Inspection/installation for Groups 1, 2, and 5, all Configuration 2 airplanes (retained actions from AD 2014-03-07): Up to $6,931 per aircraft for parts and labor.
  • Inspection/installation for Groups 1, 2, and 5, all Configuration 2 airplanes (new action): Up to $340 per aircraft for parts and labor.
  • Inspection/installation for Line Number 579 (new action): $28,345 per aircraft for parts and labor.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC